Forum quick links
EA Prerequisite: Operational Carbon Projection and Decarbonization Plan
posted by Jamy Bacchus on
The current scope within this prerequisite only includes the B6 module emissions from operational emissions and ignores B1, B7 and C1 emissions which are attribuatable to operations.
Lighting control requirement for individual occupant spaces
NC-v4.1 EQc6:Interior Lightingposted by Martina Salonen on
According to the beta update: The previous option for lighting control has been simplified to a single requirement for dimmable or multilevel lighting in occupied spaces.
Historical Rainfall data
NC-v4.1 SSc4:Rainwater Managementposted by James Lemmon on
Where do I find the historical rainfall data? Is there a website that provides this information? Thanks
PC 75 Clean Construction
Pilot-Credits SSpc75:Clean constructionposted by Patty Lloyd on
Has anyone achieved this pilot credit yet? And if so were you able to get all of the requirements? I was hoping to see a % of how many projects that attempted this credit achieved it.
Possible to specify healthy bleacher bench top?
posted by Teresa Jan on
Does anyone have a "healthy material" exterior bleacher benchtop (beyond natural wood or metal) recommendation for a public high school track and field?
Heat Island with Solar Panels
NC-v4.1 SSc5:Heat Island Reductionposted by Anna Pooler on
Hello,
I'm working on a project that has a solar array covering the majority of the roof. Can we exempt the panels from the roof calculations for Heat Island Reduction?
Refrigerant Management Plan Template
NC-v4.1 EAc6:Enhanced Refrigerant Managementposted by Chris Wapelhorst on
For v4.1 one of the required uploads to LEEDOnline is a refrigerant management plan.
What does the "three times the head height" measure mean?
CS-v4 EQc5:Quality viewsposted by Marine Petrosyan on
There is a requirement for projects with unobstructed views, for regularly occupied floor area within three times the head height.
Gender neutral restrooms
NC-v4 WEc2:Indoor water use reductionposted by Karla Mugica on
A project is being worked on that includes gender-neutral bathrooms, which have toilets with the same flow rate (this applies to all bathrooms in the building).
Fly Ash - Harmful? Alternatives for Chemically Sensitive?
posted by Marisol Foreman on
Hi All,