Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

True Open Office

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  David Edenburn  on 

We have a space about 5000 ft2 for about 160 people. It is a true open office; no cubicles, no walls, just long rows of tables & chairs.

2
Fri Mar 7, 2014, 2:08 am

High Refrigerant Charge

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Guillaume Martel  on 

We have a project where a Walk-in refrigerator and freezer are planned.

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Thu Mar 6, 2014, 10:29 pm

Future Building as a Shadowing Element

NC-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a single building certification that is located within a two tower project.

5
Thu Mar 6, 2014, 8:43 pm

Site Assessment- Design Phase?

Pilot-Credits SSpc45:Site assessment
posted by  adi ashkenazi  on 

I looked in the "credit specific" but couldn't find if this credit can be submitted during the construction phase? I will appreciate your help and from your experience with this credit Thanks

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Thu Mar 6, 2014, 4:28 pm

ASHRAE forms

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

for commercial interior rating system The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.

4
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu Mar 6, 2014, 3:07 pm

ETS Signage Requirements

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Deborah Ebersole  on 

We submitted a project for review on a campus which prohibits smoking both in the building and the entire campus site.

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu Mar 6, 2014, 3:06 pm

Energy Star-labeled but outside the target products

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Takayuki Hirota  on 

We are going to purchase a new Energy Star-Labeled TV for the office. We can find TVs available as Energy Star-qualified in the categories shown in the Energy Star website.

2
Thu Mar 6, 2014, 6:35 am

Anti-corrosive system: VOC content of individual components

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Maya Karkour  on 

Dear all, The Contractor needs to install anti-corrosive paints / coatings for one project. The anti-corrosive system consists of 2 products (the first being an epoxy primer and the second being

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Mar 5, 2014, 7:28 pm

In order to use an Energy

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Nelina Loiselle  on 

In order to use an Energy Star label for the streamlined path, the Label must have been awarded within 12 months of the LEED application submittal date.

5
President
AGR Consulting, LLC
LEEDuser Basic Member
14 thumbs up
Wed Mar 5, 2014, 5:31 pm

Closed Pilot Credit

NC-2009 IDc1:Innovation in Design
posted by  Kate Levine  on 

Does anyone have experience with pursuing a closed pilot credit as an ID credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 5, 2014, 3:21 pm