Forum quick links
Process refrigeration
NC-2009 EAp2:Minimum energy performanceposted by André Harms on
Hello. Apologies for posting on two credits but Scott Bowman rightfully suggested I re-post here. Regarding an ice cream manufacturing facility where we are managing the Cx process I have two queri
Metered Lavatory Defaults
NC-2009 WEp1:Water use reductionposted by Denise Dauplaise on
Through a series of circumstances, we are in the appeal process to try and meet WEp1.
LEED HC 2009 ID P1 and c3
Healthcare-v2009 IDc3:Integrated project planning and designposted by Osama Hassan on
Dear LEED users I would like to know, Is the ID credit 3 in HC 2009 design or construction credit, I found the ID P1 is a design credit but the ID c3 is a construction credit in the scorecard..!
Advanced Buildings™ Core Performance™ Guide for residential
ND-v2009 GIBc2:Building energy efficiencyposted by Lise Dannesboe on
Hi!
ACP EN standards in CS.IEQp1 and CS.IEQc2
CS-2009 IEQc2:Increased ventilationposted by Petr Vogel on
Dear all, when following ACP EN 13779:2007 and EN 15251:2007 in CS.IEQp1 and CS.IEQc2 we do experience a very uncertain conditions given by this method in terms of IAQ – fresh air supply. Acc.
CS 2009 or CS v4
posted by Toni Herena Montull on
Hi, this may be a silly question, but I do not know if there is any special requirement o detail that force me to start a project following CS v4 instead CS 2009. Is CS 2009 obsolete?
Street parking
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Heather Holdridge on
I am working on an urban project where parking will be provided across the street from the LEED buiilding.
Synthetic Enamel's VOC
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Yodi Danusastro on
Which one from the table that suits for Synthetic Gloss Enamel paint, that use for painting metals?
CxA Experience and energy systems
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by André Harms on
Hello, I would greatly appreciate some guidance on the below four queries: Can a CxA currently on the second required project under the supervision of a suitably experienced senior CxA take on a t
Sample M & V plan
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Saud Abdul Rasheed on
Hello All, Does anyone has a sample plan or any M & V plan which he/she can share with us here?