Topic | Recent |
---|---|
EAc1 model and EAc6 calcsPerforming LEED Green Power Calculationsposted by Tristan Roberts on Jun 22, 2012, 12:35 pmNote that according to a 4/1/12 addendum from USGBC, "If an energy model was used to document compliance with EAc1: Optimize Energy Performance, the data from the energy model must be used as the... Last reply: Tiffany Moore, Jul 26, 2013, 1:49 pm |
|
Can green power used on another project?Performing LEED Green Power Calculationsposted by Shenhao Li on Jul 1, 2013, 4:02 amWe are doing a LEED submission for a project in china. Can we buy green power for this project to get the credit, but get some preferential policy for another project in USA? By the way ,these two... Last reply: Shenhao Li, Jul 3, 2013, 10:09 pm |
|
can i take a credit for on site renewable energy for green powerPerforming LEED Green Power Calculationsposted by Christopher McArdle on Nov 17, 2011, 1:17 pmI have PV panels on my project building. Can i deduct the annual energy produced from the pv panels when calculating the amount of Green Power to purchase? Last reply: Lana Malone, Jul 7, 2012, 2:53 am |
|
Purchasing REC's for international projectsPerforming LEED Green Power Calculationsposted by Chen Shalita on May 3, 2012, 3:56 amWe're doing a LEED 2009 NC submission for an over-seas university dormitory project. We're not familiar with a local REC purchasing service. Can our project buy REC's from a US supplier, and will... Last reply: Marcus Sheffer, May 3, 2012, 11:42 am |