DefinitionsCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Mike D on Mar 26, 2013, 4:59 am
The table lists 3 components: I understand the prior condition area which is the existing... Last reply: Mike D, Mar 26, 2013, 12:36 pm |
|
Maintaining justCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Mike D on Mar 25, 2013, 11:54 am
Can we tabulate just one component e.g. finished ceiling - and not list all other components in the table? Last reply: Tristan Roberts, Mar 25, 2013, 1:50 pm |
|
Wall FinishesCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Laurie Hammack on Dec 26, 2012, 7:04 pm
We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials. The credit language, mentions "finished" walls, but does not mention wall... Last reply: April Brown, Jan 9, 2013, 12:26 pm |
|
WindowsCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Sustentator Argentina on Oct 31, 2012, 2:11 pm
For windows we count both sides or only one side? Last reply: Tristan Roberts, Nov 24, 2012, 7:32 pm |
|
What is "flooring?"CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Michael Smithing on Aug 27, 2012, 12:05 pm
The space our CI project will be occupying currently has a raised floor installed throughout. We will be retaining the entire raised floor but replacing the carpeting (which is worn and the... Last reply: Tristan Roberts, Aug 31, 2012, 10:21 am |
|
Exterior and Party WallsCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Shirong Meng on Oct 31, 2011, 5:54 am
The elements of "Exterior and Party Walls" include shell or not? It seems to be exterior walls seperated from outdoor and party walls seperated from other spaces. But in the credit requirements,... Last reply: Tristan Roberts, Nov 21, 2011, 1:28 am |
|
Existing FinishCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Sara Neff on Apr 28, 2011, 3:29 pm
I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has... Last reply: Raymond Loo, Sep 25, 2011, 6:05 am |
|
"Other Non-structural Elements" covered elsewhere??CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Gail von Staden on Apr 27, 2011, 2:06 pm
The project we are working on is looking to take advantage of MRc1.2 Building Reuse. However, this credit seems to only cover the basic non-structural elements - walls, floors, ceiling etc.... Last reply: Tristan Roberts, May 19, 2011, 11:58 pm |
|
Suggestions for Calculating Casegood areaCI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by James Shook on Mar 10, 2011, 11:58 am
We have a library project that is reusing metal shelving. Since it is being used for the same purpose this credit indicates it should be part of MR1.2. Should the surface area be calculated as... Last reply: Tristan Roberts, Mar 29, 2011, 9:53 am |
|
Demountable Partitions- Walls or Furniture or neither?CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Linda Davisson on Dec 9, 2010, 3:12 pm
Our Project is trying to decide whether Demountable Partitions that are being reused for CI Project should contribute to MRc1.2 for Building Reuse or MRc3.2 Furniture Reuse. As they are Div. 10,... Last reply: Jonathan Weiss, Dec 9, 2010, 3:30 pm |