Forum quick links
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix
Annual Energy Cost
NC-2009 EAc2:On-site renewable energyposted by Sarah Thompson on
I am trying to figure out which cost to put in here. Another post said it was savings, although I can't find anything under the credit intent or resources for this specific item.
Existing features
NC-2009 WEp1:Water use reductionposted by Charalampos Giannikopoulos on
For an existing building undergoing major renovation how should the existing water fixtures be handled as far as WE prerequisite is concerned?
Cost Analysis?
Pilot-Credits PC60:Integrative Processposted by Crina Bosch on
Thinking about pursuing this credit as an innovation for a LEEDv2009 Schools project. I'm confused about the requirements, however.
Innovation In Design Credits
NC-2009 IDc1:Innovation in designposted by Brian Harris on
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C
Thermostats with humidity and CO2
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Kristopher Lashley on
Hello all and a happy new year, I am wondering if anyone knows of a thermostat that can also measure and display humidity and CO2 levels? We are trying to find a way to cut down on the number of s
Air Economizer Requirement
NC-2009 EAp2:Minimum energy performanceposted by Rock Ridolfi on
The owner would like to eliminate economizers on a few of the air handlers.
Question about cut sheets
NC-2009 MRc4:Recycled contentposted by Magda Aghababyan on
My project uses lot of steel and that is a very large portion of the total material budget. The supplier has not provided cut sheets to confirm the recycled content of steel.
Exterior Lighting not yet designed
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Dear All, I am modeling a project which still has no exterior lighting design (the owner will decide on this when the building is almost complete). In the preliminary design review, I put the val
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?