If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fixture type in the project building similarly to EBOM v2009? Thank you in advance.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.