Can the Project Management Consultant (PMC) act as the LEED Commissioning Authority (CxA)?

NC-v4.1 EAc1:Enhanced Commissioning
posted by  Hameed Jasir  on 

Hello everyone,

I would like to clarify a scenario related to the CxA eligibility requirements for LEED v4.1 Fundamental and Enhanced Commissioning.

0

University Campus - Area outside LPB designated as "preserved and protected" greenfield or restored area allowed?

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Erica Downs  on 

Does anyone know if, on a University Campus, the owner is still allowed to designate the equivalent required area as "protected for the life of the building" somewhere outside the LPB?

0

Waste category as "construction & Demolition waste"

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Adam Insan  on 

One of project located in KSA following construction waste management credit targeting 2 points with 75% diversion as per option 2.

0

Multitenant Building

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings.

3
President & Engineer
Gaia Blueprint
LEEDuser Premium Member
1 thumbs up
Mon Oct 13, 2025, 4:17 pm

Experiences with pursuing the Daylight in nonregularly occupied spaces pilot credit?

Pilot-Credits EQpc116:Daylight in nonregularly occupied spaces
posted by  Christopher Hoeh  on 

I'm somewhat surprised by the lack of posts for this topic.  We found it matched up nicely with our OPR and desire for appropriate daylighting throughout the project.  We actually fell ju

10
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Sat Oct 11, 2025, 12:31 am

Timeline to join for project team

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Christoph Weindl  on 

We're pursuing "Social equity within the project team" with Option 2.

4
Wed Oct 8, 2025, 10:22 pm

Lighting Boundary if property boundary abuts parking spaces off of a public roadway?

NC-v4 SSc6:Light pollution reduction
posted by  Crista Shopis  on 

Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.

3
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Wed Oct 8, 2025, 7:27 pm

Contaminated Soil

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Magdalena Kolodziej Rivas  on 

If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.  

0

Ashrae

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Rihab Joucht  on 

I highly recommend attempting this credit, it's easy to achieve if you are pursuing Enhanced IAQ Strategies

0