Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to model process chilled water load?

NC-v4 EAp2:Minimum energy performance
posted by  Eric Dixon  on 

My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.

1
Thu Jul 18, 2024, 1:46 pm
3
Default Avatar
Energy Consultant - LEED AP BD+C
ECOPENTA
LEEDuser Basic Member
3 thumbs up
Mon Jul 15, 2024, 7:11 pm

Maximum Distance from Parking to Site

NC-v4 LTc7:Reduced parking footprint
posted by  Laraib Raza  on 

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?

0

*time sensitive* Presidential election advocacy opportunity

Green Commons
posted by  Clark Brockman  on 

Greetings to all of the sustainability leaders in the Green Commons!

5
Owner
Brockman Climate Strategies
LEEDuser Basic Member
0 thumbs up
Fri Jul 12, 2024, 2:29 pm

Option 1 No Parking or Reduce Parking

NC-v4.1 LTc7:Reduced Parking Footprint
posted by  Bryna Dunn  on 

When I am looking at the credit language, the first two requirement statements not connected by "OR" or "AND".  The third statement says "Alternatively".  Has anyone submitted successfull

6
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Fri Jul 12, 2024, 10:16 am

Heat recovery HVAC

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Josef Andersen  on 

Hi!

We are currently discussing a design solutions for the HVAC in a project that should fulfill LEED requirements. 

 

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jul 12, 2024, 7:17 am

High Voltage Equipment testing scope

CS-v4.1 EAp1:Fundamental Commissioning and Verification
posted by  Daisuke Miura  on 

Hi, I am working on a LEED project as Commissioning Agent. 

This is a commercial building project that is build from green field in Japan. 

0

Waste handling of process installation

NC-v4.1 MRp2:Construction and Demolition Waste Management
posted by  Josef Andersen  on 

Hi!

We are constructing industry buildings for car manufactoring. The project phase are divided between our FM team and the process team.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Jul 11, 2024, 2:25 pm

Lighting Boundary Modification - Light Trespass: Option 1. BUG Rating Method Only?

NC-v4 SSc6:Light pollution reduction
posted by  Lenka Matějíčková  on 

The LEED manual states that, under certain conditions, the lighting boundary can be modified (e.g.when the property line is adjacent to a public street, alley, or transit corridor, the lighting bou

5
Thu Jul 11, 2024, 1:15 am