Forum quick links
Common schedule for VAV zones with differing occupancies?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
What's the proper methodology for the following situation? Let's say I'm modeling a building that qualifies for a System #5 VAV baseline system and the four different spaces have different operati
the power of the baseline buliding design pump
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear Sir/Madam, per G3.1.3.10, the baseline bulidnging design pump power shall be 349kW/1000 L/s.
LEED for Homes or LEED NC?
posted by Melissa Merryweather on
I've got a live-work project. 4 buildings, Each building is 6 to 8 townhouses, with single owners in each unit, but with lower 2 floors as office or workshop, upper 2 as living space.
Open Top Parking Garage - not SRI compliant
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Pat Thomas on
In Option 2 birds-eye view, you note that an Open Top Parking Level is not required to be SRI-compliant. I cannot find where this is specifically designated ?? Can you direct me ?? Thanks.
Tenant submetering
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Rudolph Carneiro on
We are confused as to what "centrally monitored" means. Does it mean that the building owner must install wiring infrastructure to monitor each tenant individually from a BMS or can the wiring be
Schools or NC according to the age of children
posted by MARCIO OROFINO on
We are working on a project of a school aimed to children aged 4 months to 5 years. Nevertheless, we were wondering wether this project may be classified as School Rating System.
Master Site - recycled content in landscape material
posted by Deborah Lucking on
Intrepid LEEDusers, The AGMBC indicates that MRc4 is not applicable for Master Site. How would we account for landscaping material that contains recycled content?
Re multi family
posted by Chris Miller on
Would a 5 story multi family apartment building follow LEED NC or LEED for Homes? Is there a specific document the USGBC provides that clarifies this? Thanks in advance.
EAp2 and EAc1.3
CI-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am new to LEED CI and am confused about a couple of things.
Apart Hotel Certification - Homes or NC?
posted by Aaron Luthien on
We have a hotel project where the hotel rooms are designed as seperate villas and some of them also include kitchens. We want to certify a couple of villas as an example.