Injected foam insulation with 0 g/L VOCs

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Erin Holdenried  on 

I have a project using Injected foam insulation with 0 g/L VOCs. Does this product meet the credit intent? Or must it meet the specific CDHS testing requirements?

1
Thu Dec 17, 2015, 1:17 am

Multiple Building or One Building?

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Muge Karasahin  on 

We have a large scale international project, consists of five attached building blocks (A-B-B1-B2-C) that share 7 basement and 7 ground up floors but each have different amount of total floor level

0

Historical Landmark

CS-2009 EAp2:Minimum Energy Performance
posted by  Muge Karasahin  on 

We have a large scale international project in the eastern Europe.

1
Mon Aug 31, 2015, 1:51 pm

LEED EBOM EA c.4

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Fabio Frescia  on 

Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.

1
Fri Oct 16, 2015, 3:18 pm

ASHRAE 55 - apartment

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Indochine Engineering VN  on 

My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.

1
Fri Dec 11, 2015, 9:50 pm

Under the same Construction Contract

LEED Guidance for Campuses and Multiple Buildings
posted by  Nicolas Pare  on 

We registered our school project (2 Buildings) as a Group Project under the LEED for School v2009 rating system. The owner & operator are now talking about splitting the project into 2 phases

1
Fri Nov 27, 2015, 9:30 pm

Common Area Spaces/Tenant Fit Out

CS-2009 EAc1:Optimize Energy Performance
posted by  Heather South  on 

I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space

1
Mon Aug 31, 2015, 2:27 pm

1 Bus Line Vs. 2

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Heather South  on 

This credit calls for a minimum of 2 bus lines to have one or more stops within a 1/4 mile walking distance of the project.

1
Sat Nov 28, 2015, 2:53 am

Using Options 1 & 2 ID Point?

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Heather South  on 

Would it be possible to get an ID point for doing both options 1 & 2? Preferred Parking for 5% of building occupants and charging stations?

1
Sat Nov 28, 2015, 2:54 am

Canopy to building with wall opening (is it a "complete bldg")?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Lee  on 

We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.

1
Fri Nov 27, 2015, 3:52 am