Zoning in RetailCI-2009 EAc1.3: Optimize energy performance - HVACposted by Jan Hesse on May 30, 2013, 1:38 amOpportunities LEEDuser Expert 5903 thumbs up May 18, 2020- 10:01 am Toshif, please post your question in the forum for that particular credit. Log in or register to post comments ... Last reply: Marcus Sheffer, May 18, 2020, 10:01 am |
|
Energy Model Approach- Central Plant serving the Project SpaceCI-2009 EAc1.3: Optimize energy performance - HVACposted by Amal Venugopal on May 14, 2019, 6:08 am
Dear All, I am doing the Energy Model for one of CI Project considering the ASHRAE 90.1.2007 Appendix G - Performance rating method.... Last reply: Marcus Sheffer, May 15, 2019, 11:43 am |
|
Energy Model Approach- Central Plant serving the Project SpaceCI-2009 EAc1.3: Optimize energy performance - HVACposted by Amal Venugopal on May 14, 2019, 6:30 am
Dear All, I am doing the Energy Model for one of CI Project considering the ASHRAE 90.1.2007 Appendix G - Performance rating method. ... |
|
CI-2009 EAc1.3, Motor Variable Speed ControlCI-2009 EAc1.3: Optimize energy performance - HVACposted by David Schaeffer on Feb 15, 2019, 1:50 pm
I am working on a tenant build out where all the equipment is existing, as part of the recent core and shell build. The credit requirement is to show less than 30% of design wattage occurs at 50... Last reply: Marcus Sheffer, Mar 8, 2019, 11:58 am |
|
CI-2009 EAc1.3, Option 1 HVAC EfficiencyCI-2009 EAc1.3: Optimize energy performance - HVACposted by Joseph Girgenti on Feb 13, 2019, 12:46 pm
beginning design of a LEED 2009 CI project. Will be replacing AC units so want to spec units with efficiency adequate to meet this requirement. Requirement references NBI Advanced Buildings... Last reply: Marcus Sheffer, Feb 14, 2019, 11:54 am |
|
Core Performance Guide ComplianeCI-2009 EAc1.3: Optimize energy performance - HVACposted by Francis McNulty on Dec 11, 2018, 10:23 am
Hi All, We have a CI project and have a query in relation to Core Performance Guide Criteria. We are utilising the base build central plant (AHUs, Chillers, boilers). Both the... Last reply: Marcus Sheffer, Dec 12, 2018, 3:02 pm |
|
CI Office v2009- Water Cooled Chiller in Base Case & DCP in Proposed CaseCI-2009 EAc1.3: Optimize energy performance - HVACposted by SSN Energy Model on Feb 26, 2018, 7:02 am
Hi All, Greetings! I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+10 typical floors. Our tenant’s office is located at 9th Floor. Tenant’s... Last reply: SSN Energy Model, Mar 8, 2018, 4:26 am |
|
CI-2009 EA c1.3 Optimize Energy Performance HVACCI-2009 EAc1.3: Optimize energy performance - HVACposted by Jamal Anwar on Sep 7, 2017, 9:37 am
For Leed EA C1.3 calcs to comply with Core Perf Guide: We will provide load calcs, zone by zone load calcs at design conditions, Fan sizing calcs, critical path supply duct pressure load... |
|
LEED CI v3- Ofice- Energy Model. Please AdviseCI-2009 EAc1.3: Optimize energy performance - HVACposted by SSN Energy Model on Aug 14, 2017, 7:29 am
Hi, Last reply: Marcus Sheffer, Aug 23, 2017, 2:08 pm |
|
Exterior lighting designCI-2009 EAc1.3: Optimize energy performance - HVACposted by Sivarajah Ragulakeethan on Jul 31, 2017, 1:18 am
Hi, Last reply: Marcus Sheffer, Aug 1, 2017, 11:00 am |