Topic | Recent |
---|---|
Existing Laboratory EquipmentCI-2009 EAp3: Fundamental Refrigerant Managementposted by Michele Helou on Jul 8, 2016, 11:41 am
Ok - consensus has been and reviewers have supported that existing... Last reply: Melissa Kelly, Mar 6, 2017, 11:34 am |
|
District Energy Systems (DES) in LEED CICI-2009 EAp3: Fundamental Refrigerant Managementposted by James Lee on Oct 17, 2016, 7:31 pm
Hi, I am working on LEED CI EAp3, and we have central chiller units out of project boundary. Last reply: Melissa Kelly, Mar 6, 2017, 11:27 am |
|
New Equipment with or without 0.5lb of RefrigerantCI-2009 EAp3: Fundamental Refrigerant Managementposted by Michelle Rosenberger on Nov 28, 2016, 3:03 pm
I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units. I have been flagged by the reviewer on EApr3 due to the potential that one of these units... Last reply: Melissa Kelly, Mar 6, 2017, 11:19 am |
|
Different equipment types or all equipment units in scopeCI-2009 EAp3: Fundamental Refrigerant Managementposted by Edgar Arevalo on Jan 13, 2017, 10:33 am
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled. Do I include all 4 CRAC units (even though they are the same make, model, and use the... Last reply: Ashwini Arun, Jan 18, 2017, 5:50 pm |
|
Enhanced Refrigerant Mgmt as a Innovation Credit in LEED CICI-2009 EAp3: Fundamental Refrigerant Managementposted by R Jones on May 25, 2012, 12:43 pm
As there is no Enhanced Refrigerant Management credit in LEED CI is it possible to pursue this under an Innovation in Design credit ? Has anyone succesfully pursued this with USGBC and if so does... Last reply: Bridgett Weaver, May 6, 2015, 11:22 am |
|
May 2011 Addenda- CFC Phaseout PlanCI-2009 EAp3: Fundamental Refrigerant Managementposted by Michelle Ruda on Aug 9, 2011, 1:24 pm
In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed. Specifically: Pg. 148 Last reply: Dana Villeneuve, Apr 16, 2013, 12:22 pm |
|
Required SignatoryCI-2009 EAp3: Fundamental Refrigerant Managementposted by SIG - Sustainability Main Account on Apr 24, 2012, 12:32 pm
I googled 'LEED CI Required Signatory' to identify a list to help me assign roles to team members (as admin). Last reply: Emily Catacchio, May 8, 2012, 5:30 pm |
|
extents of "modification" or "influence"CI-2009 EAp3: Fundamental Refrigerant Managementposted by Dax Ponce de Leon on Dec 2, 2010, 9:16 am
We have a small CI project with existing CFC-using... Last reply: Tristan Roberts, Dec 7, 2010, 11:23 pm |
|
Criteria for third-party economic audit?CI-2009 EAp3: Fundamental Refrigerant Managementposted by Philip Herriges on Aug 5, 2010, 11:54 am
Our building Owner concedes that a third party economic audit to determine the feasiblity of retrofitting the existing equipment will likely be an exercise that needs to be done for our... Last reply: Shillpa Singh, Aug 30, 2010, 6:44 pm |
|
Help with Interpretation!CI-2009 EAp3: Fundamental Refrigerant Managementposted by Robin Bass on Mar 4, 2010, 2:03 pm
Hello LEED Community at large. . . My mechanical engineer is interpreting this Prereq. based on the LEED Reference Guide for ID&C which states on page 148 under Section 4.... Last reply: Tristan Roberts, Aug 10, 2010, 12:26 pm |