Forum » CI-2009 EAp3
Topic

Existing Laboratory Equipment

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Michele Helou on Jul 8, 2016, 11:41 am

Ok - consensus has been and reviewers have supported that existing...

Last reply: Melissa Kelly, Mar 6, 2017, 11:34 am

District Energy Systems (DES) in LEED CI

CI-2009 EAp3: Fundamental Refrigerant Management
posted by James Lee on Oct 17, 2016, 7:31 pm

Hi,

I am working on LEED CI EAp3, and we have central chiller units out of project boundary.
I saw the article saying "...

Last reply: Melissa Kelly, Mar 6, 2017, 11:27 am

New Equipment with or without 0.5lb of Refrigerant

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Michelle Rosenberger on Nov 28, 2016, 3:03 pm

I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units. I have been flagged by the reviewer on EApr3 due to the potential that one of these units...

Last reply: Melissa Kelly, Mar 6, 2017, 11:19 am

Different equipment types or all equipment units in scope

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Edgar Arevalo on Jan 13, 2017, 10:33 am

For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled. Do I include all 4 CRAC units (even though they are the same make, model, and use the...

Last reply: Ashwini Arun, Jan 18, 2017, 5:50 pm

Enhanced Refrigerant Mgmt as a Innovation Credit in LEED CI

CI-2009 EAp3: Fundamental Refrigerant Management
posted by R Jones on May 25, 2012, 12:43 pm

As there is no Enhanced Refrigerant Management credit in LEED CI is it possible to pursue this under an Innovation in Design credit ? Has anyone succesfully pursued this with USGBC and if so does...

Last reply: Bridgett Weaver, May 6, 2015, 11:22 am

May 2011 Addenda- CFC Phaseout Plan

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Michelle Ruda on Aug 9, 2011, 1:24 pm

In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed.

Specifically:

Pg. 148
Location: Economic Issues
Remove the last two...

Last reply: Dana Villeneuve, Apr 16, 2013, 12:22 pm

Required Signatory

CI-2009 EAp3: Fundamental Refrigerant Management
posted by SIG - Sustainability Main Account on Apr 24, 2012, 12:32 pm

I googled 'LEED CI Required Signatory' to identify a list to help me assign roles to team members (as admin).
Top result brought me back to LEEDOnline:
...

Last reply: Emily Catacchio, May 8, 2012, 5:30 pm

extents of "modification" or "influence"

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Dax Ponce de Leon on Dec 2, 2010, 9:16 am

We have a small CI project with existing CFC-using...

Last reply: Tristan Roberts, Dec 7, 2010, 11:23 pm

Criteria for third-party economic audit?

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Philip Herriges on Aug 5, 2010, 11:54 am

Our building Owner concedes that a third party economic audit to determine the feasiblity of retrofitting the existing equipment will likely be an exercise that needs to be done for our...

Last reply: Shillpa Singh, Aug 30, 2010, 6:44 pm

Help with Interpretation!

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Robin Bass on Mar 4, 2010, 2:03 pm

Hello LEED Community at large. . .

My mechanical engineer is interpreting this Prereq. based on the LEED Reference Guide for ID&C which states on page 148 under Section 4....

Last reply: Tristan Roberts, Aug 10, 2010, 12:26 pm