EAp2 and EAc1.3CI-2009 EAp2: Minimum Energy Performanceposted by Kalyan Nishtala on Sep 23, 2013, 3:06 pm
Hi, Last reply: Kalyan Nishtala, Sep 23, 2013, 3:44 pm |
|
Server/ Computers in Data CentreCI-2009 EAp2: Minimum Energy Performanceposted by Anthea Ng on Sep 11, 2013, 5:54 am
We have an interior renovation of works in a datacentre aiming for LEED-CI certification. The project area is managed and owned by the same client. Within the project area, part of the computer... Last reply: JOHN BURNETT, Sep 20, 2013, 2:57 am |
|
CI project modeling with central building HVAC plant systemCI-2009 EAp2: Minimum Energy Performanceposted by Aditya Chemburkar on Aug 26, 2013, 4:13 am
Hi, I am modeling a CI project for which we are going to replace all the lighting and low side Indoor HVAC units. The high side HVAC system is a central plant common for the complete... Last reply: Marcus Sheffer, Aug 26, 2013, 9:39 am |
|
Occupancy Sensor and/or Decorative lighting creditCI-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Jul 18, 2013, 11:29 am
Could occupancy sensor credit under G.3.2 be used towards meeting the 10% lighting savings requirement? Could credit for decorative lighting be implemented as well 9.6.2a? Last reply: Marcus Sheffer, Aug 12, 2013, 2:48 pm |
|
Lighting load synergy in EAp2 and EAc1.2CI-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Aug 7, 2013, 6:34 pm
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2? What if we took Occupancy sensor credit under EAp2 would that affect the input on EAc1... Last reply: Marcus Sheffer, Aug 8, 2013, 10:58 am |
|
Minimum ReqsCI-2009 EAp2: Minimum Energy Performanceposted by John-David Hutchison, LEED AP BD+C, PMP on Jan 10, 2013, 12:31 pm
We are preparing for an 4800 sq ft office renovation in a portion three story building and would like to pusue LEED-CI. We will not be touching the HVAC systems; large rooftop units.... Last reply: Crista Shopis, Jul 29, 2013, 1:19 pm |
|
Too early to determine the EnergyStar equipmentCI-2009 EAp2: Minimum Energy Performanceposted by R Jones on Jul 25, 2013, 6:32 am
Our CI project won't be occupied until 2015 and the IT and AV equipment schedules aren't yet detailed, just an outline of the power demands for the M&E design is available. We know that the... Last reply: Marcus Sheffer, Jul 25, 2013, 10:51 am |
|
HVAC to meet COP, outside USCI-2009 EAp2: Minimum Energy Performanceposted by SW LEE on May 22, 2013, 7:30 am
Hi, We have a project outside US. Our AC unit able to meet stated EER in ASHRAE 90.1, but is not ARI tested. We asked the the manufacturer, and they said product in US only will... Last reply: SW LEE, May 23, 2013, 2:42 am |
|
EA Minimum Energy Performance- Star Rated EquipmentCI-2009 EAp2: Minimum Energy Performanceposted by Anya Benkabbou on Apr 29, 2013, 12:37 pm
Could an... Last reply: Marcus Sheffer, Apr 29, 2013, 3:15 pm |
|
Design Engineer signatureCI-2009 EAp2: Minimum Energy Performanceposted by Maria Porter on Apr 12, 2013, 8:00 am
In a new build which is undergoing certification in CS and CI simultaneously; what person is the Design Engineer? The person who has to sign in EAp2? This i a CI project, it can’t be the... Last reply: Marcus Sheffer, Apr 15, 2013, 9:43 am |