Clarification of EAp2/c1 Resulting in More Electric Usage
CS-2009 EAc6:Green Powerposted by Nate Maniktala on
Hi all, Consider the following scenario: A signed purchase agreement based on annual electricity usage from the EAc1 energy model is submitted to meet the requirements of the credit.
Efficiencies for Packaged VAV with Reheat
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
As HVAC system for baseline I have to model System 5 - Packaged rooftop VAV with Reheat. I wonder what efficiencies I have to consider for the different components.
WEc1 Water Performance Measurement
EBOM-2009 WEc1:Water Performance Measurementposted by Kimberley Riley on
Our meter is owned by a 3rd party, the local utility company, it is an electronic meter, however, they only take the reading monthly.
Changing the Building Data Administrator in Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Julie Pollack on
We are working on a LEED EBOM project and having trouble with changing the Administrator for the building's Energy Star Portfolio Manager.
choosing the CxA for Enhanced Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Marina Andrade on
A project we are working on already has a CxA for the Fundamental Comissioning (Independent consultant contracted by the Owner). Can the CxA for the EAc3 be different from the EAp1 CxA?
Terrazzo Sealer Question
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Todd Bundren on
What is the VOC limit for a Terrazzo Sealer? I'm a bit confused about which category it falls under (Sealer, Floor Coating, or other).
Existing HVAC within a New HVAC System
CI-2009 EAp2:Minimum Energy Performanceposted by Nelina Loiselle on
I am working on a tenant space in which the HVAC system is going to be completely redone except for one existing HP unit.
File Uploads
posted by Mina Soliman on
I have a problem in uploading files of Credits on Leed , I Browse files and then nothing changes when i try to upload files and i have to, Urgently .... can anyone help me ?
Janitor room
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saliha AIT on
Hi, I have two options on my project (currently in design stage).
Undergroung parking under a 12 inches water pool
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Carlos Garcia on
Dear all We have the 100% of parking spaces undercover, in an underground parking (level -1).