Topic | Recent |
---|---|
Farm on RoofCI-2009 SSc1: Site Selectionposted by Kristopher Croghan on Oct 2, 2017, 11:02 am
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered. Would this roof farm be considered landscapting and... |
|
SSc1 Path 12: EV Charging StationsCI-2009 SSc1: Site Selectionposted by Alaina Ladner on Apr 13, 2016, 7:16 pm
How many EV charging stations are required to be provided to achieve this credit? The... Last reply: Kristopher Croghan, Sep 11, 2017, 5:42 pm |
|
Option 2, Path 9CI-2009 SSc1: Site Selectionposted by Pui Nang Benny Au on Mar 1, 2016, 1:29 am
My project is in Hong Kong and the host building is using seawater for flushing, (i.e. no potable water is used for sewage conveyance). Can this point be achieved since I believe the... Last reply: Tristan Roberts, Aug 26, 2017, 6:45 pm |
|
Cooling TowerCI-2009 SSc1: Site Selectionposted by Kristopher Croghan on Jun 21, 2017, 9:02 am
Our CI client owns the building they're in and are looking for additional water savings, beyond the water savings as outlined in LEED CI WEc1. They have found a new cooling tower system that aims... Last reply: Tristan Roberts, Aug 26, 2017, 6:42 pm |
|
Path 12- Low-emitting and fuel efficient vehicles per NC 2009CI-2009 SSc1: Site Selectionposted by Graham Langton on Mar 6, 2015, 11:16 am
I have a CI project with 20 allocated spaces. The overall carpark / site wide parking is over 200 spaces. The requirement is 3% of the "sites" total capacity per NC SSc4.3 for option 2: Fuelling... Last reply: Kristopher Croghan, Jul 25, 2017, 11:26 am |
|
Path 6- Light Pollution ReductionCI-2009 SSc1: Site Selectionposted by Erin Holdenried on Feb 3, 2017, 9:45 am
Does this path apply to only the spaces within the scope of work/LEED project, or the whole building the LEED project is located in? Last reply: Michael Smithing, Feb 3, 2017, 10:09 am |
|
LEED Boundary for CI and SSc1CI-2009 SSc1: Site Selectionposted by Maria Papiez on Jul 18, 2016, 2:27 pm
My project is pursuing path 7 - water efficient landscaping - for SSc1. It is my assumption that our LEED Boundary should include the landscaped site as well as the building tenant space. Is... Last reply: Michael Smithing, Jul 26, 2016, 1:00 pm |
|
Path 10CI-2009 SSc1: Site Selectionposted by Rodrigo Gomez Junco on Sep 14, 2015, 12:52 pm
We are pursuing SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is, do I need the Tenant Lease Agreement from the CS project in order to document this... Last reply: Steve Loppnow, Jan 12, 2016, 10:42 am |
|
Reopening one path of LEED-CI SSc1.2 in Construction ReviewCI-2009 SSc1: Site Selectionposted by Susan Di Giulio on Apr 11, 2015, 3:53 pm
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit. The reviewer responded that we needed to show a... Last reply: Steve Loppnow, Jan 12, 2016, 10:32 am |
|
Option 2 Path 1 Brownfield DevelopmentCI-2009 SSc1: Site Selectionposted by Vanessa Seibert on Apr 11, 2012, 2:14 pm
We are working on a college campus building. While the typical project is expected to be on a site that was remediated, our project is in a building that goes through partial asbestos abatement... Last reply: Courtney Royal, Nov 18, 2015, 4:53 pm |