Forum quick links
General Emissions Evaluation Fire Safing & Fire Blanket Ins.
NC-v4 EQc2:Low emitting materialsposted by Jerimiah Luckett on
Has anyone else come across the issue of finding a CDPH v1.1-2010 compliant Safing Insulation or SAFB Insulation? The contractor submitted the Owens Corning/Thermafiber SAFB and Safing and accord
Multiple buildings
posted by Markéta Vagenknechtová on
Our client wants to certify a complex of three new industrial buildings. Which rating system should we use? Can be three buildings certified as one project?
Airport projects now have space type options available in LEED Online
posted by Ricardo Sá on
According to USGBC, Airport projects now have space type options available in LEED Online.
IDc1.3 Green Housekeeping
Schools-2009 IDc1:Innovation in Designposted by Danielle Dunn on
We received comments back on this credit stating that the policy must follow the EBOM Policy Model. However, we are working with a new construction school. Does this still apply?
Publicly Available - Informal Transit
EBOM-v4 LTc1:Alternative transportationposted by Nandana Kumar on
Hi,
Toilet is required for Changing Room?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Karl Heitman on
Hi. I am inquiring if toilet is required as part of Changing Room for 2009 NC. Can the Changing Room be just a shower and a small area to change? Thanks in advance for your f
Limited to five products per manufacturer?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Elizabeth Kertesz on
The LEED User guidance on this credit includes the following sentence: "But just by switching things up a little you can still make this work, since you’re allowed to include up to five produ
ULEF documentation and LEED Online form
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erica Downs on
How does one document use of a ULEF melamine in LEED Online? There is only a check box for "Product Contains No Added Urea-Formaldehyde".
SCMs in recycled content calculations
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Agnieszka Rylska on
Hello!
Can we calculate recycled content in SCMs in the same way as it is applicable in LEED v3?
Thank you in advance for your answer.
Group project
EBOM-v4 EAc4:Optimize energy performanceposted by Jourdan Younis on
We have registered 2 buildings as a group project, both buildings are metered and we have the data for both buildings.