Review Comment: Leakage Rate CalculationsEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Levi Jimenez on Aug 30, 2018, 2:10 pm
More of a solution than a question I suppose; I was recently provided the following review comment: ----- The Requirements section of EAp3 in the LEED-EB O+M v2009 Reference... |
|
Enhanced Refrigerant ManagementEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by VISHESH AGARWAL on May 6, 2016, 8:39 am
if actual Rc (lb/ton) of the chiller and other refrigerant units are unknown then will i able to take default. Last reply: Levi Jimenez, May 6, 2016, 2:30 pm |
|
Refrigerants outside of the building, but still on siteEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Levi Jimenez on Sep 19, 2014, 5:30 pm
We have a property with a commercial ice machine, which uses more than 0.5 Lb CFC 502 refrigerant. The machine is located outside of, and well away from the building, but within the LEED... Last reply: Tristan Roberts, Nov 21, 2014, 12:23 pm |
|
Process refrigerant conversionEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Jennifer Knocha on Mar 20, 2014, 9:01 am
We have a walk-in freezer and refrigerator that have... Last reply: Julia Weatherby, Apr 11, 2014, 4:29 pm |
|
Refrigerant Management PlanEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Robert Calloway on Apr 17, 2013, 10:07 am
I have completed a Refrigerant Management Plan for a building and when I go to upload it to the EAp3 credit there is nowhere to place it. In the template we have chosen the second option "... Last reply: Lili Pan, Oct 15, 2013, 7:36 am |
|
Timeline on reportsEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Hugh Hagues on May 15, 2013, 7:03 pm
I have a third party report and analysis on my CFC eliminiation options. However, the report was conducted in 2009. Is there a timeline to how long I can use this report to complete the EA P3... Last reply: Lili Pan, Oct 15, 2013, 7:32 am |
|
Process Equipment RefrigerantEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Jalal Avades on Jun 26, 2013, 3:26 pm
I have a school building with an old walk-in coolers/freezers used in the Kitchen. Those do have CFC refrigerant. Those type of equipment are only listed/noted in the EA-C5 and NOT in the... Last reply: Lili Pan, Oct 15, 2013, 7:24 am |
|
Manufacturer specs required or are nameplates sufficient?EBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Alice Cook on Jul 1, 2013, 12:52 pm
Are you required to provide the manufacturer's specifications, or is it enough to upload the nameplates to LEED? I have an inventory of all HVAC equipment with manufacture name, model, serial... Last reply: Tristan Roberts, Sep 8, 2013, 1:53 pm |
|
Refrigerant Gas AB-22- ComplianceEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Marina Andrade on Mar 19, 2013, 3:38 pm
Hi, Does anyone knows if the Refrigerant Gas AB-22-A comply with the CFC´s -... Last reply: Tristan Roberts, Mar 22, 2013, 1:42 pm |
|
DHC Plant with CFC refrigerantEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Noriko Nagazumi on Oct 15, 2012, 9:40 pm
Our project is served by district heat and cilled water plant. The plant, owned by different componay from our project owner, uses CFC refrigerant for some of chillers. It is difficult to do... Last reply: Tristan Roberts, Nov 23, 2012, 3:30 pm |