Case 1, Option 2 baselineEBOM-2009 WEc3: Water Efficient Landscapingposted by Ryan Tinus on Jun 17, 2015, 1:42 pm
Hi, Last reply: William Weaver, Jan 16, 2018, 4:56 pm |
|
mixed non-potable and potable water used for irrigationEBOM-2009 WEc3: Water Efficient Landscapingposted by Pablo Fortunato Suarez on Oct 18, 2016, 1:38 pm
The project is using predominantly non-potable water for irrigation (~97%). Systems include recycled water from sewage treatment plant and rain water harvesting. In theory, the sewage treatment... Last reply: Dan Ackerstein, Jan 18, 2017, 12:44 pm |
|
hand watering for irrigationEBOM-2009 WEc3: Water Efficient Landscapingposted by cathy keagle on Jun 28, 2016, 2:34 pm
What irrigation efficiency should be used for hand watering? Last reply: cathy keagle, Oct 5, 2016, 1:00 pm |
|
No Permanent Irrigation SystemEBOM-2009 WEc3: Water Efficient Landscapingposted by Kevin Sullivan on Jun 11, 2012, 7:31 am
Hi we are attempting this credit for one of our existing schools project.The project does not have permanent irrigation system.The landscape area is irrigated manually by the facility staff... Last reply: anupama pandey, Sep 6, 2016, 2:41 am |
|
Rainfall over landscape areasEBOM-2009 WEc3: Water Efficient Landscapingposted by Rubén M. R. on Mar 29, 2016, 7:43 pm
Would it be valid to claim 50% potable water reduction for irrigation if I have a landscape area that requires X galons of irrigation during the month of July (according to the LEED form) and I... Last reply: Kimberly Schlaepfer, Apr 6, 2016, 6:58 pm |
|
What if landscaping isn't installed yet?EBOM-2009 WEc3: Water Efficient Landscapingposted by Vanessa Seibert on Sep 15, 2015, 8:07 pm
We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way? The client's... Last reply: Ben Stanley, Sep 24, 2015, 1:23 pm |
|
WEc3 vs WEc1EBOM-2009 WEc3: Water Efficient Landscapingposted by Charalampos Giannikopoulos on Feb 18, 2015, 10:13 am
If we install subsystem metering for the irrigation systems to comply with WEc1 can we follow the “Non-Metered Irrigation” option at WEc3? This is because historical data are not available since... Last reply: Vanessa Seibert, Sep 9, 2015, 2:25 pm |
|
AstroTurfEBOM-2009 WEc3: Water Efficient Landscapingposted by Alexis Voeltner on May 11, 2015, 2:15 pm
What is LEED's stance on AstroTurf? I have a building that replaced all of their grass with this and am curious if it is now considered hardscape. Last reply: Kimberly Schlaepfer, May 15, 2015, 2:48 pm |
|
Baseline landscape typeEBOM-2009 WEc3: Water Efficient Landscapingposted by Charalampos Giannikopoulos on Apr 27, 2015, 12:57 pm
For a project where turf grass area is replaced by native low-irrigation demanding planting would baseline landscape type include turf whereas design type include the new water efficient species... Last reply: Charalampos Giannikopoulos, Apr 28, 2015, 3:20 am |
|
Special situationEBOM-2009 WEc3: Water Efficient Landscapingposted by Andres Giraldo on Jul 31, 2014, 12:29 pm
Hi, Last reply: Dan Ackerstein, Jul 31, 2014, 12:58 pm |