Forum quick links
Temperature and Humidity Monitoring During Flush
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nancy Henderson on
Is it part of the requirement of this credit to monitor temperature and humidity in the space during the flush out - or is it sufficient to provide the temperature set points and calculate the resu
Reclaimed water use
NC-v4 WEc1:Outdoor water use reductionposted by Ann Runley Carroll on
If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?
Previously Developed Site vs. Prime Farmland
NC-2009 SSc1:Site Selectionposted by Jennifer Carlson on
I have a site that is currently on previously developed site. Utilities, sidewalks, etc are already in place. However the Soil Survey says the land the is prime farmland if drained.
Additional Baseline System for pre-cooled spaces
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone
FXCollaborative hiring a Sustainable Design Specialist
posted by Ilana Judah on
We are hiring! Please share with any potential talented and passionate candidates.
Brick and rubble in soil
NC-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.
Brick and rubble in soil
CS-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 Core & Shell project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.
Lighting Requirements for Hotel in Core and Shell
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi everyone,
We are currently working with a mixed-use building which has offices, commerce and a hotel.
Greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by Lene Hill on
The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it. This is where the new site is going.
use open space outside of project area
Healthcare-v4 SSc3:Open spaceposted by Lene Hill on
We have a project (building and parking lot) being built in a small master planned community. The community has several open spaces natural areas adjacent to the project with walking trails.&