Meeting Acoustic Performance Credit requirements for a furniture factory

NC-v4.1 EQc9:Acoustic Performance
posted by  Junaid Mujahid  on 

Hi forum users!

A furniture factory project I'm working on is attempting to target the LEED v4.1 NC Acoustic Performance credit. 

Project Details:

1
Fri May 30, 2025, 11:18 am

Autocase inputs slightly different than LEED Outputs

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Jill Kurtz  on 

We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information.

9
Default Avatar
Associate
Introba Canada
LEEDuser Basic Member
0 thumbs up
Thu May 22, 2025, 8:45 pm

Monitoring - Mechanically ventilated spaces

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Anna Bortkiewicz  on 

Hello, I have a system in a hotel that has a constant air volume system of crca 550 l/s and I am not sure how to correspond to the requierement of LEED: 

3
Mon May 19, 2025, 12:02 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2:Low emitting materials
posted by  Edgar Arevalo  on 

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,

10
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Sat May 17, 2025, 4:48 am
4
Default Avatar
Junior HVAC Design Engineer - Sustainability
PNC Architects
LEEDuser Basic Member
2 thumbs up
Fri May 16, 2025, 2:30 pm

LEED v4 EBOM Campus/Group Benchmarking for 3 buildings sharing 1 meter and energy source for Semiconductor Manufacturing

LEED Guidance for Campuses and Multiple Buildings
posted by  Summer Gorder  on 

We are working with a semiconductor manufacturing facility that would like to achieve LEED EBOM for their manufacturing facility which is on a larger campus.

0

LEED v4 EBOM Campus/Group 3 buildings sharing 1 meter and energy source for Semiconductor Manufacturing

LEED Guidance for Campuses and Multiple Buildings
posted by  Summer Gorder  on 

We are working with a semiconductor manufacturing facility that would like to achieve LEED EBOM for their manufacturing facility which is on a larger campus.

0

Experience with the Credit

Pilot-Credits EQpc116:Daylight in nonregularly occupied spaces
posted by  Sara Galar  on 

Thanks to the shape of the building, dimensions and quality of the facade, we were able to pursued this Pilot credit.

2
Default Avatar
Building Performance Analyst
Page
LEEDuser Basic Member
0 thumbs up
Thu May 15, 2025, 3:07 pm