Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Documenting Rated Power for Gas Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Dana Villeneuve  on 

Does anyone have experience documenting the rated power of a gas appliance? Are we to only document the electricity usage of gas appliances, or do we account for the gas usage?

4
Rosa D Cheney AIA, PLLC
LEEDuser Basic Member
0 thumbs up
Tue Jan 28, 2014, 6:17 pm

LEED boundary and pre-existing parking structure.

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Oishi  on 

I've been looking through the forums and documentation and get some conflicting information. We're trying to establish an appropriate LEED project boundary for our project.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Jan 28, 2014, 6:16 pm

LEED AP without speciality

ND-v2009 IDc2:LEED Accredited Professional
posted by  David ESPAGNET  on 

Dear Sir Or Madam, Can one of you confirm me if a LEED AP without speciality is eligible for this credit? Many thanks in advance

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 28, 2014, 5:57 pm

IEQc3.3 LEED EBOM 2009

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Teresa Farmer  on 

Do I need to submit the product purchase tracking sheet when submitting for this credit?

3
Default Avatar
Director of Sustainability and Training
Kelsan Inc
LEEDuser Basic Member
0 thumbs up
Tue Jan 28, 2014, 4:25 pm

Recertification Guideance for credits implemented every 5 years

LEED Recertification: When and How
posted by  Antoni Paleshi  on 

I have a few projects that certified under LEED EB:O+M 2009, receiving their certification in 2011 or 2012.

6
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Tue Jan 28, 2014, 4:00 pm

Alternative Compliance Path from one project for another project

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  CT G  on 

Hello, We have submitted an alternative compliance path for WEp1 which was denied. However, the same alternative compliance path was accepted during a previous review for another project.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jan 27, 2014, 8:10 pm

EQc5 Negative Exhaust Rates

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Scott West  on 

I'm trying to figure out the exhaust airflow rates required for chemical pollutant source rooms in a hospital (e.g. janitor's closets, copy rooms, etc.).

5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Jan 27, 2014, 10:52 am

site selection C1

NC-2009 SSc1:Site Selection
posted by  Elisa Sequeros  on 

I would like to do the exam LEED AP and I have a very specific question : FOR A PREVIOUSLY UNDEVELOPED SITE, WHAT WATER BODIES DO NOT HAVE TO MEET THE 50-FOOT SETBACK CRITERIA TO COMPLY SUSTAINAB

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Mon Jan 27, 2014, 7:20 am

Entryway Grates and Mats

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Elizabeth Felder  on 

The building has entryway grates a few feet in length in the vestibule of all building entrances.

4
Mon Jan 27, 2014, 2:17 am

PVC floor adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Valentin Grimaud  on 

Dear experts, we are purchasing the PVC floor adhesive, but i'm not sure which category is more suitable for this kind of adhesive in leedonline form, we considered "Rubber Flooring Adhesives" but

2
Sun Jan 26, 2014, 8:58 am