Topic | Recent |
---|---|
Poor Cell Phone Service in LEED Buildings?NC-2009 IEQc8.1: Daylight and views - daylightposted by Dennis Carlberg on Jan 4, 2012, 9:13 am
I have heard that the low-E coatings on windows has been found to block cellular phone singals and make many LEED certified buildings "dead zones" for wireless service. Has anyone encountered... Last reply: Doug Macdonnell, Sep 4, 2020, 2:43 pm |
|
self servie seating area- glare controlNC-2009 IEQc8.1: Daylight and views - daylightposted by J Schütz on Feb 4, 2020, 10:09 am
Dear all, is for Option 2 Prescriptive a glare control needed for a seating area with self-service in a hotel, even if the VLT x... Last reply: J Schütz, Feb 12, 2020, 8:26 am |
|
Sun Shades as "view-preserving automated shades" and north-face glazing- Option 2: PrescriptiveNC-2009 IEQc8.1: Daylight and views - daylightposted by Edgar Arevalo on Sep 19, 2019, 4:41 pm
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18 However, based on the spreadsheet, those spaces with high VLTxWFR can still be included in the total... |
|
Accounting for Sun Shade as view-preserving automated shades and North facing glazing-NC-2009 IEQc8.1: Daylight and views - daylightposted by Edgar Arevalo on Sep 19, 2019, 4:35 pm
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18 However, based on the spreadsheet, those spaces with high VLTxWFR can still be included in the total... |
|
Prescriptive: Automated shades for only some windows in spaceNC-2009 IEQc8.1: Daylight and views - daylightposted by Kristina Bach on Jul 13, 2016, 10:25 am
A corner room in our project has windows on two sides (North + West). Currently, the project is designed to include view-preserving automated shades for just the west wall. These windows make up... Last reply: Edgar Arevalo, Sep 19, 2019, 3:37 pm |
|
VLT x WFR TOO HIGH?NC-2009 IEQc8.1: Daylight and views - daylightposted by Elissa Wu on Aug 14, 2019, 4:05 pm
Hello I am inputting a regularly occupied space in the calculator via the sidelighting prescriptive method. The Zone Floor Area is 148 SF (which is the nearly the size of the entire space... |
|
IEQc8.1 Required InformationNC-2009 IEQc8.1: Daylight and views - daylightposted by Victoria Rios Esteve on Jul 24, 2019, 4:04 pm
Hi everyone! We are close to upload the construction submittal on a project we are working on. On this credit, we were planning to upload Supplemental Daylight and Views Calculation... |
|
theatre/music/ event room in hotel projectNC-2009 IEQc8.1: Daylight and views - daylightposted by Natalia Kwiecinska on Dec 5, 2018, 10:59 am
Hi everyone, I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help. On hotel’s underground level is located a theatre/ music/ event room. ... Last reply: TODD REED, Dec 6, 2018, 10:33 am |
|
Ice Rink in Daylight Calculations?NC-2009 IEQc8.1: Daylight and views - daylightposted by Diana Smiciklas on Jul 18, 2018, 10:24 am
I'm currently working on an arena and aquatics complex, and I'm having trouble dictating if a lot of these spaces are included in the calculations as "regularly occupied spaces". The issue with... Last reply: Jill Perry, PE, Aug 1, 2018, 10:09 am |
|
Daylight Anaylsis SpreadsheetNC-2009 IEQc8.1: Daylight and views - daylightposted by Casey Kuntz on Nov 7, 2017, 3:12 pm
I've read up on this topic previously but am still quite confused. When running the daylight analysis for a large elementary school, 9 AM ran at 90% and 3 PM ran at 77%. I've input in the... Last reply: TODD REED, Nov 8, 2017, 7:37 am |