Topic | Recent |
---|---|
Credit compliance in elevator hallsNC-2009 IEQc7.1: Thermal comfort - designposted by Paula Hernandez on Jul 26, 2016, 1:15 pm
Hi, Last reply: Gabriela Crespo, Jul 27, 2016, 11:04 am |
|
Thermal Comfort- Adaptive MethodNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Jun 17, 2016, 7:19 am
Dear All:- As of now we are using berkeley.edu/comfort tool for thermal comfort compliance for both A/c & Non A/c area But we use PMV method for A/c area and adaptive method for... Last reply: Christopher Schaffner, Jun 30, 2016, 3:39 pm |
|
Thermal Comfort- Adaptive MethodNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Jun 17, 2016, 7:05 am
Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c... |
|
Room Input ReportNC-2009 IEQc7.1: Thermal comfort - designposted by Bill Friedl on Apr 22, 2016, 11:52 am
I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space... Last reply: Cam Fitzgerald, Apr 25, 2016, 2:12 pm |
|
ASHRAE 55 ComplianceNC-2009 IEQc7.1: Thermal comfort - designposted by David Mirabile on Jan 14, 2016, 11:33 am
My project is a Housing Authority remodel that has to meet Energy Star, thus be ASHRAE 55 compliant. Of course our budget is limited, but we are reusing perimiter HW finned tube in one of the... Last reply: Lindsay Austrom, Jan 25, 2016, 12:17 pm |
|
Method to Achieve Thermal- Comfort for Ventilated AreaNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Aug 31, 2015, 4:15 am
Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area Last reply: Christopher Schaffner, Jan 25, 2016, 10:44 am |
|
MET RatesNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Jan 5, 2016, 2:57 am
1.What is a MET rate for Sewing machine workers (Jeans cloth stitching) Last reply: Christopher Schaffner, Jan 25, 2016, 10:41 am |
|
Open office with Displacement ventilation and Chilled beamsNC-2009 IEQc7.1: Thermal comfort - designposted by Zonda E. Team on Jul 30, 2015, 2:24 pm
Hi there, I'm working on a office project with Chilled beams and Displacement ventilation. We are planning to do CFD simulations to analyse radiant temperature asymmetry , drafts vertical air... Last reply: Christopher Schaffner, Dec 11, 2015, 4:52 pm |
|
ASHRAE 55- apartmentNC-2009 IEQc7.1: Thermal comfort - designposted by Indochine Engineering VN on Aug 30, 2015, 11:08 am
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally. I'm wondering how to document for this credit: do I... Last reply: Christopher Schaffner, Dec 11, 2015, 4:50 pm |
|
Naturally Ventilated, Mechanically Cooled spaceNC-2009 IEQc7.1: Thermal comfort - designposted by Gabriela Crespo on Nov 26, 2015, 1:29 pm
In ASHRAE 55, Section 5.3 Optional Method for Naturally Conditioned, it mentions that "There must be no mechanical cooling system for the space". Last reply: Gabriela Crespo, Dec 1, 2015, 11:38 am |