Furniture & Furnishings in MR Credits

CI-2009 MRc4:Recycled Content
posted by  Patty Lloyd  on 

In LEED v3 CI are furniture and furnishings budget still required to be included in the MR credits 4,5, & 6?

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri May 12, 2017, 2:14 pm

No 2-year, 24 hour design storm data available

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Mario S.  on 

The 2 year, 24-hour design storm precipitation data is unavailable for the country. However, Historic rainfall data exists.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri May 12, 2017, 6:39 am

cold, dark warehouses in v4

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Michelle Rosenberger  on 

The majority of our Core & Shell warehouse projects are cold, dark shells with no tenants. We do not see a path for these projects to achieve certification at all in LEED v4 C&S.

3
Fri May 12, 2017, 4:39 am

BPDO calculator and Furniture

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Michelle Rosenberger  on 

As I understand it, IDC projects are required to use Actual Materials cost and to include furniture in that cost.

2
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Thu May 11, 2017, 11:08 pm

Support Buildings impact on Heat Island Effect

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Daniela Mendez  on 

We have a project with a support building with no FTEs, hence, it is not a certifiable building according to the MPRs and we will only be using it to count the materials waste management.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu May 11, 2017, 8:16 pm

Lagre building modeling suggestion

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling is a huge one - a little more than 900 000 sq ft and it is not C&S.

3
Thu May 11, 2017, 6:41 pm

College Campus, mixed use buildings, and public accessibility

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Erica Downs  on 

We are attempting Op. 2: Community Connectivity on a college campus. We have plenty of services on campus that are open to the general public to meet the requirements.

3
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Thu May 11, 2017, 2:54 pm

Campus application

NC-v4 SSc4:Rainwater management
posted by  Rob Hink  on 

Our LEED project site falls within a larger medical campus which has a campus-wide stormwater management plan which meets the credit requirements.

3
Thu May 11, 2017, 2:36 pm

basecase System

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear Concern:- Greetings Our project is G+5 but A/c spaces are located in 3 Floors only and A/c area is totally below 10000 Square feet only (electrical heating only) so we have some queries in

5
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Thu May 11, 2017, 7:06 am

Additional Flush-out Duration after Air Test Failed

Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Kim Lombard  on 

If Option 2 for an air test fails, the remedy is .... "....conduct an additional flush-out with outside air and retest the noncompliant concentrations. Repeat until all requirements are met.

2
Wed May 10, 2017, 6:50 pm