Core Performance Guide and M&V PlanNC-2009 EAc5: Measurement and Verificationposted by Jeremy Kuhre on Mar 18, 2010, 1:40 pm
We are pursuing EA points under the Core Performance Guide (CPG) alternate compliance path. One of the requirements of the CPG (1.7 Performance Data Review) requires that specific metering... Last reply: Christopher Schaffner, Apr 6, 2010, 10:34 am |
|
types of meteringNC-2009 EAc5: Measurement and Verificationposted by Elizabeth Warlop on Feb 17, 2010, 9:29 am
Is it true that if you did not do a full building simulation in Credit EA 1: that you would be using Option B? We have a fairly small office building and I am assuming that tthe addition of... Last reply: Joseph Orr, Feb 17, 2010, 2:55 pm |
|
Option B and DNC-2009 EAc5: Measurement and Verificationposted by Gilbrt Dilanchian on Jan 25, 2010, 1:13 pm
Hi Chris, Option B is based on adding submeters and isolate the energy use, while Option D is based on simulation. But as you learn more about Option D, it appears that it also needs for... Last reply: Christopher Schaffner, Jan 27, 2010, 10:03 am |