Forum » NC-2009 EAc5
Topic

Phased project implementation

NC-2009 EAc5: Measurement and Verification
posted by Tim Murray on Sep 13, 2019, 11:55 am

We have a phased higher education project in which a new building addition will be built first, then the existing buildings will be renovated and open a year later. Does the college need to...

Last reply: Marcus Sheffer, Sep 15, 2019, 5:47 pm

Is Manual Measurement acceptable?

NC-2009 EAc5: Measurement and Verification
posted by Summer on Sep 2, 2019, 8:44 am

I would like to clarify if manual measurement is acceptable and compliant in this credit. We have a project that has BMS or building management system that can only monitors the HVAC consumption...

Last reply: Summer, Sep 3, 2019, 8:10 pm

why only a plan and not a final report after M&V?

NC-2009 EAc5: Measurement and Verification
posted by ANNE JURAN on Apr 28, 2011, 10:57 am

To earn this credit all we submit is the plan which basically says we're going to recalibrate and we'll deal with any problems later, right? Is there any backcheck from...

Last reply: Ralph Bicknese, Sep 17, 2018, 3:25 pm

Sharing data on energy star

NC-2009 EAc5: Measurement and Verification
posted by Omar Elrawy on Apr 16, 2018, 4:56 am

Dear all,

I need to know what if my actual energy or water performance data shared on energy star exceeds the documented performance, what if the building uses more energy/water?  also...

Last reply: Marcus Sheffer, Apr 16, 2018, 11:05 am

Direct vs indirect measurements

NC-2009 EAc5: Measurement and Verification
posted by Juan Morales on Dec 9, 2014, 3:54 pm

Hi everyone,

We are working on a Residential New Construction Project, compound of more than 100 apartments, pursuing Option D - Calibrated Simulation. All apartments will have their own...

Last reply: Marcus Sheffer, Feb 9, 2018, 1:37 pm

IPMVP Option D+ PV System

NC-2009 EAc5: Measurement and Verification
posted by Nasim Mirian on Jan 8, 2018, 6:34 pm

Hello,

I am currently working on a project for which I am writing a M&V Plan implementing Option D of...

Last reply: Marcus Sheffer, Jan 9, 2018, 1:04 pm

Measurement period

NC-2009 EAc5: Measurement and Verification
posted by Lise Dannesboe on Dec 5, 2017, 4:35 am

Hi.

we willa s minimum share 1 year of monthly energy consumptions with USGBC, but when should this periode start? People are moving into the building, but it is not fully occupied and we...

Last reply: Marcus Sheffer, Dec 5, 2017, 9:04 am

LEED v.2009 NC EA Credit 5

NC-2009 EAc5: Measurement and Verification
posted by Andrew Buck on Nov 30, 2017, 11:09 am

We are designing a Hotel with the following systems:

  • Vertical 2-Pipe Heat Pumps in the Guestrooms (with Central Boiler and Chiller Plant)
  • Ceiling Mounted 2-Pipe Heat Pumps...

Last reply: Marcus Sheffer, Nov 30, 2017, 12:35 pm

Sub-metering Required?

NC-2009 EAc5: Measurement and Verification
posted by David Hubka on Nov 3, 2017, 5:17 pm

Hello,
We typically implement Option D of...

Last reply: Marcus Sheffer, Nov 6, 2017, 2:56 pm

EnergyStar Reporting

NC-2009 EAc5: Measurement and Verification
posted by Karl Heitman on Jul 31, 2017, 4:12 pm

comments for a page (http://www.leeduser.com/credit/NC-2009/EAc5?all-comments=true) and do a search. There are 41 instances of "Option 3" for this forum related to your question. For instance, see...

Last reply: Karl Heitman, Aug 1, 2017, 11:31 am