Modeling District Cooling / HeatingNC-2009 EAc1: Optimize Energy Performanceposted by Maya Karkour on Apr 3, 2013, 6:19 am
Dear All, I've been reading through the details of modeling a district heating / cooling plant, and it seems rather complicated! Two options, many methods.. The project is a new... Last reply: Marcus Sheffer, Apr 3, 2013, 10:02 am |
|
VRV and ASHRAE 90.1-2007 and 189.1 StandardsNC-2009 EAc1: Optimize Energy Performanceposted by Sonia M. Miranda Palacios on Mar 22, 2013, 9:38 am
Hi all. I´m working in a project with VRV and want to specify a system with high COP values, and three issues surfaced.... 1- Since there is no exact system specified in the ASHRAE... Last reply: Sonia M. Miranda Palacios, Mar 25, 2013, 2:20 pm |
|
EA P2 and EA C1 requirements clarificationsNC-2009 EAc1: Optimize Energy Performanceposted by BABAR MEHMOOD on Mar 2, 2013, 3:56 am
in EA P2, it's written to comply with mandatory provisions which are for example 5.4 which is related to Building envelope under Option 1. But in EA C1, under Option 1, building envelope section... Last reply: Scott Bowman, Mar 19, 2013, 11:03 am |
|
Option 2: ASHRAE Advanced Energy Design GuideNC-2009 EAc1: Optimize Energy Performanceposted by Heather Holdridge on Mar 7, 2013, 12:03 pm
We are following the option 2 ASHRAE AEDG presciptive path for a project. One of the AEDG requirements for HVAC is for a heat pump >135 kBtuh to be at minimum 10.1 EER or above. We have... Last reply: Scott Bowman, Mar 7, 2013, 12:45 pm |
|
VRF systems and outside air modelingNC-2009 EAc1: Optimize Energy Performanceposted by Robert Sutton on Mar 4, 2013, 10:11 pm
Has anyone done a VRF system serving various zones using say heat pump VRF units and then providing outside ventilation air from a separate dedicated unit serving the same various zones? Is... Last reply: Robert Sutton, Mar 7, 2013, 10:02 am |
|
Heat Pipe Simulation for EAc1NC-2009 EAc1: Optimize Energy Performanceposted by Kai Andrade on Mar 1, 2013, 7:59 pm
How do I simulate a heat pipe in the Baseline case? Last reply: Kai Andrade, Mar 6, 2013, 3:12 pm |
|
Meeting EAp2 in Zone 1 without A/C?NC-2009 EAc1: Optimize Energy Performanceposted by Katrina Morgan on Jan 25, 2013, 8:25 pm
We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning. I am not the mechanical engineer, but I am generally aware... Last reply: Colin Inderwish, Mar 6, 2013, 12:35 pm |
|
EAP2 Mandatory RequirementNC-2009 EAc1: Optimize Energy Performanceposted by OSCAR DE LA RED on Mar 4, 2013, 8:22 am
Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not... Last reply: Marcus Sheffer, Mar 4, 2013, 11:08 am |
|
All-electric buildingsNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Feb 28, 2013, 11:46 am
A note of Table G3.1.1A of ASHRAE 90.1-2007 states that "For all-electric buildings, the heating shall be electric resistance". I am not a native English speaker and I don't know the definition... Last reply: Marcus Sheffer, Feb 28, 2013, 12:22 pm |
|
Comaprison of EAp2 and EAc1NC-2009 EAc1: Optimize Energy Performanceposted by BABAR MEHMOOD on Feb 28, 2013, 3:01 am
I want to clarify that ASHRAE 90.1 Appendix G 2007 (sec 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4 ) is applicable to Option-1 Whole building energy simulation for both EA Prerequisite 2 and EA Credit 1.... Last reply: Marcus Sheffer, Feb 28, 2013, 10:00 am |