guestrooms keycard: power adjustment for automatic lighting ctrlNC-2009 EAc1: Optimize Energy Performanceposted by Habitech Distretto Tecnologico Trentino on Feb 27, 2013, 8:57 am
This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off. Can credits be taken in the proposed case for... Last reply: Marcus Sheffer, Mar 21, 2018, 2:39 pm |
|
Principal Heating sourceNC-2009 EAc1: Optimize Energy Performanceposted by Rahula Attalage on Feb 3, 2018, 2:26 am
Dear All, I am in the process of making a NC submittal for an industrial facility. The energy supply system is based on Gas Engine Elect Generators and their waste heat is used to run the... Last reply: Marcus Sheffer, Feb 8, 2018, 10:04 am |
|
Minimum 18% energy saving after April 2016- ScoringNC-2009 EAc1: Optimize Energy Performanceposted by Eric Claycamp on Nov 21, 2017, 11:47 am
My project will likely reach 20% to 23% Energy Savings. Does this mean I can only score the points after I meet the minimum? In other words is a 20 percent reduction only one credit point? Or is... Last reply: Marcus Sheffer, Dec 28, 2017, 11:02 am |
|
Energy modeling- DOAS units with reactivation airNC-2009 EAc1: Optimize Energy Performanceposted by Matt Hollenbeck on Dec 7, 2017, 10:14 amthem for help. There is also a Trace Users discussion forum at onebuilding.org where you can post questions. In general if the software you are using cannot explicity and directly model something... Last reply: Marcus Sheffer, Dec 9, 2017, 2:31 pm |
|
Office Building with Data CenterNC-2009 EAc1: Optimize Energy Performanceposted by Lise Dannesboe on Oct 3, 2012, 7:31 am
I have a possible case with a office building that also contains a large Data Center. The data center is only 2 % of the square meters, but accounts for about 85 % of the preliminary assumed... Last reply: Tristan Roberts, Nov 27, 2017, 9:36 am |
|
Energy Saving from Process BoilerNC-2009 EAc1: Optimize Energy Performanceposted by sompoche sirichote on Sep 14, 2017, 5:14 am
Our project is an existing manufacturing project and we have 1 existing steam boiler and will install 1 new. Both steam boilers will supply steam for process equipment only not for space... Last reply: kapil Bhati, Oct 12, 2017, 5:51 am |
|
Orientation for existing building energy simulationNC-2009 EAc1: Optimize Energy Performanceposted by Mark JIN on Aug 1, 2017, 6:12 am
Hello, I'm doing a factory project in Bangkok now. A new production building will be built adjacent to an existing production building. And renovation work will also be conducted on the... Last reply: Marcus Sheffer, Aug 1, 2017, 11:28 am |
|
EAc1 Space Cooling and HeatingNC-2009 EAc1: Optimize Energy Performanceposted by Mark Rawson on Jul 6, 2017, 7:27 pmon their forum by email (hap-users@lists.onebuilding.org). Good luck Log in or register to post comments ... Last reply: Khaled Fouda, Jul 7, 2017, 10:12 am |
|
ASHRAE 90.1-2015 to 2007 equivalency tableNC-2009 EAc1: Optimize Energy Performanceposted by Luis Huertas on May 18, 2017, 1:31 pm
We are working on a project that is using ASHRAE 90.1-2015 version and we are looking for a table listing the equivalency of points similar to the one done for the 2010 version? Any resources... Last reply: Billy Condor, Jun 16, 2017, 5:23 pm |
|
DES with CHP, electric and absorption chillers and boilersNC-2009 EAc1: Optimize Energy Performanceposted by Ricardo Sá on May 16, 2017, 10:51 am
A building pursuing LEED 2009 NC certification will be located in a campus with a District Energy System (... Last reply: Marcus Sheffer, May 26, 2017, 11:22 am |