Topic | Recent |
---|---|
LEED--NC 2009 Summitals platmatel EA credit 1NC-2009 EAc1: Optimize Energy Performanceposted by Yu Tang c850802@ms10.hinet.net on Apr 26, 2014, 12:55 am
Hello,Anyone : Thanks and best regards, Y.T. Last reply: Marcus Sheffer, Apr 27, 2014, 2:43 pm |
|
AHU system for industrial productionNC-2009 EAc1: Optimize Energy Performanceposted by Renaud Gay on Apr 17, 2014, 11:59 pm
I am working on a energy modeling for a relocation industry factory, The entire space is conditioned. Since the air clean condition of production area has a high requirement, the factory design... Last reply: Marcus Sheffer, Apr 25, 2014, 9:52 am |
|
Baseline Energy modelling using air cooled chillersNC-2009 EAc1: Optimize Energy Performanceposted by Lakshmi Suryan on Apr 6, 2014, 4:19 am
I am working on a LEED project in Qatar and wanted to query USGBC on using aircooled chillers in the baseline building instead of water cooled chillers. Has anyone requested permission to change... Last reply: Marcus Sheffer, Apr 7, 2014, 9:33 am |
|
USGBC Approved equivalent standardsNC-2009 EAc1: Optimize Energy Performanceposted by Mike D on Apr 3, 2014, 5:02 am
The guide allows to use a USGBC approved equivalent standard for projects outside the US. Where can this list of approved standards be found? Last reply: Donald Green, Apr 3, 2014, 9:50 am |
|
Process EnergyNC-2009 EAc1: Optimize Energy Performanceposted by John McCullough on Apr 2, 2014, 11:30 am
Hi Last reply: Marcus Sheffer, Apr 2, 2014, 3:35 pm |
|
Lighting controlsNC-2009 EAc1: Optimize Energy Performanceposted by Isabel Santos on Mar 31, 2014, 8:27 am
Dear all, Last reply: Marcus Sheffer, Mar 31, 2014, 2:04 pm |
|
App G Baseline HVAC ZonesNC-2009 EAc1: Optimize Energy Performanceposted by Victoria Watson on Mar 14, 2014, 2:58 pm
Hi, Last reply: Marcus Sheffer, Mar 26, 2014, 4:45 pm |
|
Existing Envelope for LEED v3NC-2009 EAc1: Optimize Energy Performanceposted by Ken Pilcher on Mar 20, 2014, 11:24 pm
Any help regarding the... Last reply: Marcus Sheffer, Mar 23, 2014, 4:07 pm |
|
Partial Existing EnvelopeNC-2009 EAc1: Optimize Energy Performanceposted by Clint Whitney on Mar 17, 2014, 3:39 pm
I'm performing an energy model that is a renovation of an existing... Last reply: Marcus Sheffer, Mar 17, 2014, 5:18 pm |
|
HVAC Design Case Equivalent of VRF systemsNC-2009 EAc1: Optimize Energy Performanceposted by Achelles DSouza on Mar 16, 2014, 1:54 am
I am working in an Office block project (conditioned area- 8500 sqft). VRF systems have been considered for it. The modelling software that we are using is Visual DOE which unfortunately cannot... Last reply: Marcus Sheffer, Mar 16, 2014, 4:04 pm |