Topic | Recent |
---|---|
Does PPR piping need insulation?NC-2009 EAp2: Minimum Energy Performanceposted by Rudolph Carneiro on Nov 1, 2012, 2:42 pm
We have run into a situation with piping material used in a hotwater distribution system. Our client is using Polypropelene piping. (PPR) Last reply: Marcus Sheffer, Nov 1, 2012, 5:48 pm |
|
Energy Modeling for DMV Inspection StationNC-2009 EAp2: Minimum Energy Performanceposted by Maria Fiorelli on Nov 1, 2012, 4:29 pm
We have a project in question that is DMV office and vehicle inspection station. The vehicle inspection lanes side of the building are approximately 50% of the total project square footage. The... Last reply: Marcus Sheffer, Nov 1, 2012, 5:13 pm |
|
LED Screens--In or out of the BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Rob Watson on Oct 24, 2012, 6:30 pm
I'm working on the a project that has LED "media screens" on each of its four facades. Would I include this energy and power load in the baseline as part of "process"--it's for advertising and... Last reply: Rob Watson, Oct 31, 2012, 9:36 am |
|
Review CommentsNC-2009 EAp2: Minimum Energy Performanceposted by Emily Catacchio on Nov 11, 2011, 9:52 am
Maybe this is old news, but I just discovered it, so maybe others haven't yet. Last reply: Marie Kranjack, Oct 29, 2012, 6:32 pm |
|
ASHRAE 90.1-2007 6.4.1.4- Verification of Equipment EfficiencesNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 29, 2012, 8:21 am
There is a Brazilian HVAC manufacturer that has an centrifugal chiller with magnetic bearings equipment (air condensation). The equipment is not tested by AHRI and there is no laboratory in... Last reply: Marina Andrade, Oct 29, 2012, 2:01 pm |
|
Option 1 for District Thermal EnergyNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Oct 24, 2012, 6:28 am
I’m modeling a building that is connected to a district... Last reply: Marcus Sheffer, Oct 24, 2012, 10:26 am |
|
SF used for energy model vs. building GSFNC-2009 EAp2: Minimum Energy Performanceposted by Craig Flandermeyer on Oct 22, 2012, 4:31 pm
Our building energy model s.f.(table eap2-1) 74,000+/- does not match the gross building s.f. reported in 1.1A 94,000+/-. The difference is approximately 20,000 s.f. and is due to wall thickness... Last reply: Marcus Sheffer, Oct 22, 2012, 7:36 pm |
|
Office Building + warehouse + Production FloorNC-2009 EAp2: Minimum Energy Performanceposted by Jackson . on Oct 17, 2012, 6:08 am
Hi all, We have a project back in climate zone 1 and in the struggling to understand energy modeling for such building combination. Last reply: Marcus Sheffer, Oct 22, 2012, 10:16 am |
|
G3.1.2.9 and Miscellaneous Exhaust Fan PowerNC-2009 EAp2: Minimum Energy Performanceposted by Matt Edwards on Oct 16, 2012, 5:29 pm
Section G3.1.2.9 says that baseline "system fan electrical power for supply, return, exhaust, and relief (excluding power to fan-powered... Last reply: Matt Edwards, Oct 18, 2012, 11:25 am |
|
EAp2 Prescriptive Path- Renovation and AdditionNC-2009 EAp2: Minimum Energy Performanceposted by Eric Elizondo on Oct 17, 2012, 9:59 am
EAp2- Option 2 Prescriptive Method The current project consists of an existing building that is being renovated along with a new addition to the building. The prescriptive method indicates... Last reply: Marcus Sheffer, Oct 17, 2012, 10:34 am |