Ventless equipment in commercial application question

NC-2009 EAp2: Minimum Energy Performance
posted by Michelle McConnell on Jun 19, 2020, 9:07 am

Do ventless dishmachines or ventless cooking equipment provide for leed points?  If so, how?

Last reply: Marcus Sheffer, Jun 26, 2020, 9:06 am

Sports Field Lighting (Flood lights)

NC-2009 EAp2: Minimum Energy Performance
posted by Ameet AA on Feb 28, 2013, 5:57 am

LEEDuser Expert 5578 thumbs up June 10, 2020- 1:07 pm I would suggest you post your question in the forum for the Light Polution credit. Log in or register to post comments ...

Last reply: Marcus Sheffer, Jun 10, 2020, 1:07 pm

ASHRAE 2007 G 3.1.1 Exception B

NC-2009 EAp2: Minimum Energy Performance
posted by Jonathan Burgess on May 23, 2020, 11:29 am

I am working on a retail project with three restaurant spaces. I got a comment below from the LEED reviewer. 

"The General HVAC and Air-Side HVAC tabs indicate that system type 6: Packaged...

Last reply: Cam Fitzgerald, May 26, 2020, 2:50 pm

PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009

NC-2009 EAp2: Minimum Energy Performance
posted by Susan Di Giulio on Apr 8, 2020, 2:17 pm

Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's...

Last reply: Marcus Sheffer, Apr 10, 2020, 4:29 pm

PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009

NC-2009 EAp2: Minimum Energy Performance
posted by Susan Di Giulio on Apr 8, 2020, 2:34 pm

Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's...

Last reply: Marcus Sheffer, Apr 8, 2020, 7:46 pm

Energy modeling, Chiller at AHRI conditions

NC-2009 EAp2: Minimum Energy Performance
posted by Santiago Sánchez Sánchez on Mar 10, 2020, 1:17 pm

Hi,

I’m modeling a building which has water-cooled chillers.

It comes down that the provider has sent us the chiller specs, and the chiller efficiency was tested at no AHRI...

Last reply: Tyler Thumma, Mar 25, 2020, 3:15 pm

Baseline Chillers

NC-2009 EAp2: Minimum Energy Performance
posted by Santiago Sánchez Sánchez on Mar 12, 2020, 4:27 pm

Greetings,

We are working on a large project which has 10 customized Chillers each chiller over 2,000 tons.

When I model the baseline, the total cooling capacity is...

Last reply: Marcus Sheffer, Mar 13, 2020, 10:26 am

90.1 Mandatory Provisions

NC-2009 EAp2: Minimum Energy Performance
posted by Charles Daze on Oct 20, 2015, 12:47 pm

Does Appendix G or LEED modeling protocol require the baseline building be modeled with all of the mandatory provisions of Section 6.4? And if so where is this stated?

Appendix G implies...

Last reply: Gustavo De las Heras Izquierdo, Feb 19, 2020, 3:41 pm

Mandatory provisions ASHRAE 90.1.2007- International projects

NC-2009 EAp2: Minimum Energy Performance
posted by Elodie DUMAS on Feb 5, 2013, 3:58 am

Dear all,

My question concerns the issue “EA prerequisite 2-Minimum Energy Performance”, especially the following requirements :
“Compliance with the mandatory provisions (Sections...

Last reply: Sara ALIA YOUSSOUFI, Feb 5, 2020, 12:23 pm

Software limitations

NC-2009 EAp2: Minimum Energy Performance
posted by Nicolas Martinez Ochoa on Jan 22, 2020, 10:04 am

Hello

I have issues simulating a water cooled coil (software limitations), and so I’m trying to simulate an equivalent thermodynamically system. I want to know if this methodology is valid...

Last reply: Nicolas Martinez Ochoa, Jan 24, 2020, 11:10 am