Log in
Forum » NC-2009 WEp1
Topic

lavatory faucet in a dormitory

NC-2009 WEp1: Water Use Reduction
posted by Nelina Loiselle on Feb 25, 2016, 12:12 pm

Hello,

I am working on a Co-ed dormitory were all of the bathrooms will be residential with the exception of two single occupancy bathrooms on the ground floor. These bathrooms will are...

Last reply: Michelle Robinson Schwarting, Mar 29, 2016, 9:44 am

Multi-Flow Showerhead

NC-2009 WEp1: Water Use Reduction
posted by Annalise Reichert on Mar 1, 2016, 5:16 pm

I am working on a project that plans to install a shower head with three flow options: 0.5 GPM-1.0 GPM -1.5 GPM. How do we account for multi-flow showerheads on the WEp1 form? This circumstance...

Last reply: Carlie Bullock-Jones, Mar 2, 2016, 5:14 pm

FTE for campus or for building

NC-2009 WEp1: Water Use Reduction
posted by Karen Elliott on Jan 27, 2016, 10:35 am

We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire...

Last reply: Melissa Merryweather, Jan 29, 2016, 9:34 pm

FTE for campus or for building

NC-2009 WEp1: Water Use Reduction
posted by Karen Elliott on Jan 27, 2016, 10:49 am

We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire...

FTE for campus or for building

NC-2009 WEp1: Water Use Reduction
posted by Karen Elliott on Jan 27, 2016, 10:22 am

We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire...

Accounting for shower use by non-occupants

NC-2009 WEp1: Water Use Reduction
posted by Deborah Lucking on Sep 30, 2015, 7:35 pm

Ours is a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building. The clubhouse has a much lower staff number than the other...

Last reply: Carlie Bullock-Jones, Jan 4, 2016, 11:54 am

EUROPE: Pre-rinse spray valve 1.6gpm or lower

NC-2009 WEp1: Water Use Reduction
posted by Charline SEYTIER on Jul 15, 2013, 9:27 am

Our project is an office bldg with a Kitchen Restaurant in Europe.
We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in France/Switzerland/Germany...
Has...

Last reply: Julien Richard, Jan 4, 2016, 11:19 am

Water Consumption Outside LEED Boundary

NC-2009 WEp1: Water Use Reduction
posted by Aswin M on Dec 24, 2015, 4:06 am

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).
The Main block has cutting & sewing sections only and the occupants of...

Last reply: Melissa Merryweather, Jan 3, 2016, 11:52 pm

Male occupant usage w/ family rstrm next to gang rstrms

NC-2009 WEp1: Water Use Reduction
posted by Renee Shirey on Oct 13, 2015, 4:59 pm

Since the default assumption is that 100% of male occupants will use a restroom with a urinal, how do you calculate the usage when there is a family toilet (without a urinal) next to the large...

Last reply: Carlie Bullock-Jones, Dec 30, 2015, 4:28 pm

PSI for faucets and showers

NC-2009 WEp1: Water Use Reduction
posted by Francis McNulty on Dec 9, 2015, 5:29 am

Hi,

Can anyone please advise on the following;

Do shower flow rates need to be calculated at 80 psi and installed at 80 psi?

The same for for faucets, do flow rates need to...

Last reply: Carlie Bullock-Jones, Dec 30, 2015, 4:20 pm