Topic

Do we include Non-certifiable structure in Building gross area?

NC-2009 MPR7: Must comply with a minimum building area to site area ratio
posted by Anya Fiechtl on Mar 27, 2015, 12:41 pm

modelers to determine what counts. Also check out the modeling masters in the EAp2 LEEDuser forum, http://www.leeduser.com/credit/NC-2009/EAp2. In LEEDonline, you will enter area data for both the building...

Last reply: Jon Clifford, Aug 4, 2015, 10:31 pm

Projects on shared sites and Minimum s.f.

NC-2009 MPR7: Must comply with a minimum building area to site area ratio
posted by Robyn Vettraino on Oct 21, 2013, 1:44 pm

I have two buildings on a shared site. The two buildings are Registered to share the site under a Block Project, therefore both the buildings together clearly comply with the minimum building to...

Last reply: Tristan Roberts, Nov 5, 2013, 8:52 am

Site Disturbance vs. LEED Boundary

NC-2009 MPR7: Must comply with a minimum building area to site area ratio
posted by SmithGroup BG+LU FW on Jul 19, 2013, 1:04 pm

I am working on design documents for a 22 acre urban site that will be developed into a public park. The site is currently classified as a brownfield and in the development agreement with the...

Last reply: Tristan Roberts, Nov 5, 2013, 8:45 am