Forum quick links
Regional Priority Credits - Outside US Projects
EBOM-2009 RPc1:Regional Priorityposted by Sundararaj Subburaman on
My project is located in 411045 in Pune, India. It is not listed in the EBOM spreadsheet tab and does not appear using the "Find" function.
Regional points for EAc1 - Optimize Energy Performance
NC-2009 RPc1:Regional Priorityposted by Mariah Grife on
My project has EA c1 listed as a possible Regional Priority credit. This credit allows 1-19 points, does my project apply for a Regional credit if I get even (1) point on EAc1?
RP for Credits with multiple thresholds
NC-2009 RPc1:Regional Priorityposted by Deborah Lucking on
Can a project achieve the Regional Priority point without hitting the higher threshold of a credit?
Reference for the building annual energy cost
CS-2009 EAc2:On-site Renewable Energyposted by Ricardo Sá on
In a Core&Shell project, the percentage of renewable energy integration shall be refered to the total building energy use (including tenants areas) or only to core and shell energy use ?
Ez for projects unable to meet ASHARE 62.1-2007?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hello. Is it necessary to consider the zone air distribution effectiveness (Ez) for projects unable to meet ASHARE 62.1-2007 when calculating 10cfm/person minimum ventilation? Thanks in advance,
Ambient scenting allowed under green cleaning?
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Jared Silliker on
Has anybody ever included ambient scenting fragrance cartridges in their IEQc3.3 calculations?
Timing of survey?
ND-v2009 SLLp2:Imperiled species and ecological communities conservationposted by Colin Inderwish on
In order to meet this prerequisite, does the survey have to be complete (and addressed by a biologist if need by) by a certain time/stage in the project planning?
coca cola
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Emmanuel Pauwels on
Would coca cola bottles be considered regional if the bottling plant is within the required distance?
Amish Foods
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Michael McPheron on
We are entertaining the idea of having lunches of locally produced food. We live in an area with a high Amish population and anticipate buying a lot of food from them.
Confused
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Craig Wilson on
Okay, why does the Credit Language above refer to a minimum of 10 fc when the O&M 2010 edited reference guide clearly states a minimum of 25 fc?