FTE calculation for 24/7 facilityNC-2009 PIf3: Occupant and Usage Dataposted by Kyle Strock on Apr 20, 2020, 3:55 pm
We have a detention center intake facility which operates 24/7. Monday thru Friday there are 16 employees per 8 hour shift. On weekends there are 14 employees per 8 hour shift. (We also have... Last reply: Summer Minchew, Apr 20, 2020, 4:49 pm |
|
Occupancy type- transient vs. residentNC-2009 PIf3: Occupant and Usage Dataposted by Brooke Odom on Dec 6, 2012, 2:09 pm
We are working on a project for the Navy. It is a facility that acts as a hotel - navy personnel will stay at the facility for a few days until they head to their ship. We consider these... Last reply: Susan Di Giulio, Oct 16, 2019, 1:09 pm |
|
California ACP for LEED-NC v2009- is CALGreen checklist required?NC-2009 PIf3: Occupant and Usage Dataposted by Susan Di Giulio on Feb 7, 2019, 6:43 pm
Hi, Nearly all of our projects are in California. We have been using the CA ACP path for v2009 projects, which only applies to 6 pre-reqs and credits, successfully since it came out. We... |
|
FTE Computation VerificationNC-2009 PIf3: Occupant and Usage Dataposted by Summer on Nov 22, 2018, 2:37 am
My project is a theater and I was so confused how to compute the right... Last reply: Summer, Dec 2, 2018, 9:03 pm |
|
Complex Daily Occupancy- Daily Average TransientsNC-2009 PIf3: Occupant and Usage Dataposted by Joe Malone on Aug 21, 2018, 12:56 pm
We have a project with a complex occupancy. The facility is secure and staffed 24/7 by two groups, each group having 3 8-hour shifts. The majority (95%) of the workers spend about 1.5 hours in... Last reply: David Eldridge, Aug 22, 2018, 5:14 pm |
|
PIf3 Total number of residentsNC-2009 PIf3: Occupant and Usage Dataposted by Oscar Estevez on Apr 25, 2018, 9:46 pm
I have a Hospital project with one question on Table Plf3-3 Total number of residents: NOTE: Assume two residents per one-bedroom unit, three residents per two-bedroom unit, etc., unless... Last reply: David Eldridge, Aug 10, 2018, 4:02 pm |
|
Reviewer Writes: Daily average FTE values should be higher than Peak FTE valuesNC-2009 PIf3: Occupant and Usage Dataposted by Diego Prada on Jul 25, 2018, 5:25 pm
Greetings everyone, We received a review for a Healthcare project. In it the review team is asking why "the Staff... Last reply: David Eldridge, Aug 10, 2018, 3:51 pm |
|
Theater and Retail OccupancyNC-2009 PIf3: Occupant and Usage Dataposted by Summer on Aug 6, 2018, 2:25 am
Hello, I have a Theater project that has a retail space operating 24/7 on the side of the building. I was wondering how to compute the occupancy of the retail since one of their transient... |
|
Preschool OccupancyNC-2009 PIf3: Occupant and Usage Dataposted by Heather Holdridge on Apr 12, 2018, 11:35 am
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is... Last reply: David Posada, Apr 12, 2018, 6:16 pm |
|
Occupants for Multi-purpose Hall and CanteenNC-2009 PIf3: Occupant and Usage Dataposted by Sjansie Lachica on Apr 6, 2018, 1:45 am
My project is a mixed-use building which consist a whole floor assigned as multi-purpose hall and another floor as canteen. Do we need to determine the number of occupants in multi-purpose hall?... Last reply: Summer Minchew, Apr 11, 2018, 8:49 am |