Topic

California ACP for LEED-NC v2009- is CALGreen checklist required?

NC-2009 PIf3: Occupant and Usage Data
posted by Susan Di Giulio on Feb 7, 2019, 6:43 pm

Hi,

Nearly all of our projects are in California. We have been using the CA ACP path for v2009 projects, which only applies to 6 pre-reqs and credits,  successfully since it came out. We...

FTE Computation Verification

NC-2009 PIf3: Occupant and Usage Data
posted by Summer on Nov 22, 2018, 2:37 am

My project is a theater and I was so confused how to compute the right...

Last reply: Summer, Dec 2, 2018, 9:03 pm

Occupancy type- transient vs. resident

NC-2009 PIf3: Occupant and Usage Data
posted by Brooke Odom on Dec 6, 2012, 2:09 pm

We are working on a project for the Navy. It is a facility that acts as a hotel - navy personnel will stay at the facility for a few days until they head to their ship. We consider these...

Last reply: Summer Minchew, Oct 30, 2018, 8:33 am

Complex Daily Occupancy- Daily Average Transients

NC-2009 PIf3: Occupant and Usage Data
posted by Joe Malone on Aug 21, 2018, 12:56 pm

We have a project with a complex occupancy. The facility is secure and staffed 24/7 by two groups, each group having 3 8-hour shifts. The majority (95%) of the workers spend about 1.5 hours in...

Last reply: David Eldridge, Aug 22, 2018, 5:14 pm

PIf3 Total number of residents

NC-2009 PIf3: Occupant and Usage Data
posted by Oscar Estevez on Apr 25, 2018, 9:46 pm

I have a Hospital project with one question on Table Plf3-3 Total number of residents:

NOTE: Assume two residents per one-bedroom unit, three residents per two-bedroom unit, etc., unless...

Last reply: David Eldridge, Aug 10, 2018, 4:02 pm

Reviewer Writes: Daily average FTE values should be higher than Peak FTE values

NC-2009 PIf3: Occupant and Usage Data
posted by Diego Prada on Jul 25, 2018, 5:25 pm

Greetings everyone,

We received a review for a Healthcare project. In it the review team is asking why "the Staff...

Last reply: David Eldridge, Aug 10, 2018, 3:51 pm

Theater and Retail Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by Summer on Aug 6, 2018, 2:25 am

Hello,

I have a Theater project that has a retail space operating 24/7 on the side of the building. I was wondering how to compute the occupancy of the retail since one of their transient...

Preschool Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by Heather Holdridge on Apr 12, 2018, 11:35 am

I received a preliminary design phase review comment on a preschool project for this PI form.  We entered identical values for the peak and average transient occupancy because the building is...

Last reply: David Posada, Apr 12, 2018, 6:16 pm

Occupants for Multi-purpose Hall and Canteen

NC-2009 PIf3: Occupant and Usage Data
posted by Sjansie Lachica on Apr 6, 2018, 1:45 am

My project is a mixed-use building which consist a whole floor assigned as multi-purpose hall and another floor as canteen. Do we need to determine the number of occupants in multi-purpose hall?...

Last reply: Summer Minchew, Apr 11, 2018, 8:49 am

Regularly Occupied Area- Kitchen Countertops and Islands

NC-2009 PIf3: Occupant and Usage Data
posted by Rose Winter on Mar 20, 2018, 2:27 pm

I know that residential kitchens are considered regularly occupied. However, one thing that doesn't always get consistently documented is how the area of the kitchen that is in an open floor plan...

Last reply: Rose Winter, Mar 21, 2018, 4:04 pm