Topic

PI Form 2 Estimated project budget

NC-2009 PIf2: Project Summary Details
posted by Brian Durgin on Jan 10, 2019, 5:05 pm

Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.  Is the total estimated project budget for the entire...

Last reply: Summer Minchew, Jan 11, 2019, 1:33 pm

Emergency Generator

NC-2009 PIf2: Project Summary Details
posted by Nicole Kimoto on Aug 13, 2013, 1:55 pm

In our new facility we have an emergency generator that runs on diesel. If this is the case...on PIf2 should "fuel oil" be checked on the form under energy and water sources, even though its not...

Last reply: Lise Dannesboe, Aug 23, 2018, 11:28 am

Parking Area Square Footage

NC-2009 PIf2: Project Summary Details
posted by Jim Pugh on Jul 27, 2018, 11:56 am

With respect to calculating the "Square footage of all parking areas" . . . is that square footage calculation to include the paved route to access to spaces such as in a  parking lot situation...

Last reply: Deborah Lucking, Jul 27, 2018, 1:01 pm

Reapplying for credits

NC-2009 PIf2: Project Summary Details
posted by jupiter luner on Jun 15, 2018, 10:57 am

We're getting ready to move onto construction phase. During the design phase review, our water efficient landscaping credit was denied.  However, I was wondering if we would be able to reapply...

Last reply: Paula Melton, Jun 20, 2018, 11:16 am

LEED scope of two Separate Buildings sharing a Parking Structure.

NC-2009 PIf2: Project Summary Details
posted by Adrian Arenas on Feb 7, 2018, 2:21 pm

Hello All, 

We are currently working on a project that has a specific situation in the site regarding its LEED boundary that I would like to double check. (LEED New Construction...

Last reply: Adrian Arenas, Feb 23, 2018, 6:20 pm

Change LEED boundary after Design Review?

NC-2009 PIf2: Project Summary Details
posted by Joyce Kelly on May 31, 2017, 5:38 pm

LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim. Design review, they decided to reduce boundary to include all areas affected...

Last reply: Allison Smith, May 31, 2017, 6:41 pm

Project boundary dilemma: City stormwater permit vs LEED area

NC-2009 PIf2: Project Summary Details
posted by Craig Wilson on Feb 8, 2017, 12:34 pm

Hi! Our site is located in Minneapolis and is a rather complex historic urban...

Last reply: Allison Smith, May 19, 2017, 6:07 pm

Total Site Area within LEED Project Boundary

NC-2009 PIf2: Project Summary Details
posted by Sara Curlee on Feb 10, 2017, 2:42 pm

I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?

Last reply: Deborah Lucking, Feb 10, 2017, 4:38 pm

Area of all Parking- PI form 2

NC-2009 PIf2: Project Summary Details
posted by sara todavchick on Mar 24, 2016, 3:30 pm

In PI form 2, I am asked to provide the sq ft of the "area of all parking wtihin the LEED project boundary". My project is a master site with 6 projects and within one of my project boundaries I...

Last reply: Mary Jo Riley, Dec 6, 2016, 12:10 pm

want to get information about previous LEED certified projects

NC-2009 PIf2: Project Summary Details
posted by Amir Salehi on Oct 19, 2016, 6:38 pm

Hello dear professionals,
I have got a question and that is it:
How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail...

Last reply: Trista Little, Oct 21, 2016, 6:50 pm