Topic

Building Footprint in mixed used building

NC-2009 PIf2: Project Summary Details
posted by Victoria Rios Esteve on May 17, 2021, 3:47 am

Hi everyone, 

We are working on one building that has 2 different programmes. But, only one is going under LEED certification. That means that in GF both programmes appear, but with clear...

Last reply: Deborah Lucking, May 17, 2021, 11:37 pm

Project boundary

NC-2009 PIf2: Project Summary Details
posted by Nick Toon on Mar 23, 2021, 9:22 am

Hi, we are building an airport under new construction (2009). The construction works include the concourse, taxi stands and taxiways.  Are we able to draw the project site boundary around the...

Last reply: emily reese moody, Mar 30, 2021, 7:51 pm

Changing Total Gross Floor Area in PIf2 during Preliminary Design Review

NC-2009 PIf2: Project Summary Details
posted by Edgar Arevalo on May 5, 2020, 2:51 am

I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft. documented in...

Last reply: Allen Cornett, Jun 5, 2020, 12:41 pm

Change LEED boundary after Design Review?

NC-2009 PIf2: Project Summary Details
posted by Joyce Kelly on May 31, 2017, 5:38 pm

LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim. Design review, they decided to reduce boundary to include all areas affected...

Last reply: Edgar Arevalo, May 5, 2020, 2:49 am

Existing Building Fire Escapes- Building Square-footage

NC-2009 PIf2: Project Summary Details
posted by Katherine Norris on Aug 7, 2019, 11:36 am

Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying.  They are full exterior, self supported, and only connect to the building with lateral steel...

Last reply: David Posada, Aug 7, 2019, 1:18 pm

PI Form 2 Estimated project budget

NC-2009 PIf2: Project Summary Details
posted by Brian Durgin on Jan 10, 2019, 5:05 pm

Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.  Is the total estimated project budget for the entire...

Last reply: Summer Minchew, Jan 11, 2019, 1:33 pm

Emergency Generator

NC-2009 PIf2: Project Summary Details
posted by Nicole Kimoto on Aug 13, 2013, 1:55 pm

In our new facility we have an emergency generator that runs on diesel. If this is the case...on PIf2 should "fuel oil" be checked on the form under energy and water sources, even though its not...

Last reply: Lise Dannesboe, Aug 23, 2018, 11:28 am

Parking Area Square Footage

NC-2009 PIf2: Project Summary Details
posted by Jim Pugh on Jul 27, 2018, 11:56 am

With respect to calculating the "Square footage of all parking areas" . . . is that square footage calculation to include the paved route to access to spaces such as in a  parking lot situation...

Last reply: Deborah Lucking, Jul 27, 2018, 1:01 pm

Reapplying for credits

NC-2009 PIf2: Project Summary Details
posted by jupiter luner on Jun 15, 2018, 10:57 am

We're getting ready to move onto construction phase. During the design phase review, our water efficient landscaping credit was denied.  However, I was wondering if we would be able to reapply...

Last reply: Paula Melton, Jun 20, 2018, 11:16 am

LEED scope of two Separate Buildings sharing a Parking Structure.

NC-2009 PIf2: Project Summary Details
posted by Adrian Arenas on Feb 7, 2018, 2:21 pm

Hello All, 

We are currently working on a project that has a specific situation in the site regarding its LEED boundary that I would like to double check. (LEED New Construction...

Last reply: Adrian Arenas, Feb 23, 2018, 6:20 pm