Rehabilitation of a historic buildingNC-2009 PIf1: Minimum Program Requirementsposted by Veronica Reed on Sep 30, 2015, 12:33 pm
Hello we are working on a rehabilitation project for a small hotel being developed in an existing... |
|
Multiple Buildings Project CertificationNC-2009 PIf1: Minimum Program Requirementsposted by Mario S. on Jun 17, 2015, 7:56 am
We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage... Last reply: Mario S., Jun 22, 2015, 10:59 am |
|
Structures connected through a walkwayNC-2009 PIf1: Minimum Program Requirementsposted by Ricardo Sá on Jun 22, 2015, 7:20 am
I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas. The... |
|
LEED NC 2009 Group CertificationNC-2009 PIf1: Minimum Program Requirementsposted by Neumann Monson on May 13, 2015, 6:17 pm
Our project consists of two buildings on a shared site, to be built in two phases. The first building consists of an underground level of parking, one level of... Last reply: Trista Brown, May 14, 2015, 12:25 pm |
|
LEED boundary for a railway stationNC-2009 PIf1: Minimum Program Requirementsposted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am
LEED NC 2009 Our project is a major railway station in Qatar. The shape of the... |
|
LEED Project Boundary for Renovation ProjectsNC-2009 PIf1: Minimum Program Requirementsposted by Nicholas Klever on Jan 16, 2015, 10:00 am3 forum for more information, specifically the section discussing "Project boundaries that include other buildings". http://www.leeduser.com/credit/NC-2009/MPR3 Log in or register to post comments ... Last reply: Kimberly Frith, Jan 19, 2015, 2:22 pm |
|
Certifying an addition to an existing building with LEED NCNC-2009 PIf1: Minimum Program Requirementsposted by Veronica Reed on Jan 15, 2015, 10:48 amKimberly Frith LEEDuser Basic Member 323 thumbs up January 19, 2015- 2:16 pm Veronica, it is possible to pursue LEED NC for additions- check out the MPR #2 forum for more information: http://www.leeduser.com/credit/NC-2009/MPR2 Log in or register to post comments ... Last reply: Kimberly Frith, Jan 19, 2015, 2:16 pm |
|
Design submissionsNC-2009 PIf1: Minimum Program Requirementsposted by Stella Stella on Oct 29, 2014, 10:26 pm
Hi, Last reply: Markus Henning, Oct 30, 2014, 3:22 am |
|
One or two separate buildingsNC-2009 PIf1: Minimum Program Requirementsposted by Felipe Holguin on Oct 9, 2014, 11:56 am
I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both... Last reply: Brian Salazar, Oct 14, 2014, 9:08 pm |
|
LEED V4 DATA CENTERNC-2009 PIf1: Minimum Program Requirementsposted by Caroline Vallieres on Oct 14, 2014, 2:02 pm
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box. Can I still make 1... Last reply: Tristan Roberts, Oct 14, 2014, 7:29 pm |