Rehabilitation of a historic building

NC-2009 PIf1: Minimum Program Requirements
posted by Veronica Reed on Sep 30, 2015, 12:33 pm

Hello we are working on a rehabilitation project for a small hotel being developed in an existing...

Multiple Buildings Project Certification

NC-2009 PIf1: Minimum Program Requirements
posted by Mario S. on Jun 17, 2015, 7:56 am

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage...

Last reply: Mario S., Jun 22, 2015, 10:59 am

Structures connected through a walkway

NC-2009 PIf1: Minimum Program Requirements
posted by Ricardo Sá on Jun 22, 2015, 7:20 am

I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas. The...

LEED NC 2009 Group Certification

NC-2009 PIf1: Minimum Program Requirements
posted by Neumann Monson on May 13, 2015, 6:17 pm

Our project consists of two buildings on a shared site, to be built in two phases. The first building consists of an underground level of parking, one level of...

Last reply: Trista Brown, May 14, 2015, 12:25 pm

LEED boundary for a railway station

NC-2009 PIf1: Minimum Program Requirements
posted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am

LEED NC 2009

Our project is a major railway station in Qatar. The shape of the...

LEED Project Boundary for Renovation Projects

NC-2009 PIf1: Minimum Program Requirements
posted by Nicholas Klever on Jan 16, 2015, 10:00 am

3 forum for more information, specifically the section discussing "Project boundaries that include other buildings". http://www.leeduser.com/credit/NC-2009/MPR3 Log in or register to post comments ...

Last reply: Kimberly Frith, Jan 19, 2015, 2:22 pm

Certifying an addition to an existing building with LEED NC

NC-2009 PIf1: Minimum Program Requirements
posted by Veronica Reed on Jan 15, 2015, 10:48 am

Kimberly Frith LEEDuser Basic Member 323 thumbs up January 19, 2015- 2:16 pm Veronica, it is possible to pursue LEED NC for additions- check out the MPR #2 forum for more information: http://www.leeduser.com/credit/NC-2009/MPR2 Log in or register to post comments ...

Last reply: Kimberly Frith, Jan 19, 2015, 2:16 pm

Design submissions

NC-2009 PIf1: Minimum Program Requirements
posted by Stella Stella on Oct 29, 2014, 10:26 pm

Hi,
we are currently working on a project which is nearing substantial completion but we haven't yet done our design submissions for LEED.
will it affect our LEED certification?...

Last reply: Markus Henning, Oct 30, 2014, 3:22 am

One or two separate buildings

NC-2009 PIf1: Minimum Program Requirements
posted by Felipe Holguin on Oct 9, 2014, 11:56 am

I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both...

Last reply: Brian Salazar, Oct 14, 2014, 9:08 pm

LEED V4 DATA CENTER

NC-2009 PIf1: Minimum Program Requirements
posted by Caroline Vallieres on Oct 14, 2014, 2:02 pm

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box. Can I still make 1...