Forum » NC-2009 PIf1
Topic

Difficulty uploading the form

NC-2009 PIf1: Minimum Program Requirements
posted by Avery Gretton on Nov 17, 2020, 9:47 am

Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit". I've repeatedly downloaded, completed, and attempted...

Last reply: Tristan Roberts, Dec 10, 2020, 12:01 pm

Reasonable Project Site Boundary

NC-2009 PIf1: Minimum Program Requirements
posted by Katherine Norris on Jun 18, 2019, 4:03 pm

Hello!  The project I am working on is a full renovation of a...

Last reply: Emily Purcell, Jun 19, 2019, 1:38 pm

MPR #6- Option 3

NC-2009 PIf1: Minimum Program Requirements
posted by Edgar Arevalo on Apr 22, 2019, 9:52 am

So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences.  However, since I've been charged with filling out the instructions tab, I'm...

PI Form 1, Must Use a Reasonable Site Boundary

NC-2009 PIf1: Minimum Program Requirements
posted by Vincent Pieri on Apr 10, 2019, 2:55 pm

Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundary...

LEED 2009 Submission deadline

NC-2009 PIf1: Minimum Program Requirements
posted by Amy Harmon on Nov 13, 2018, 4:05 pm

Is there a deadline for projects that have been registered as 2009?  Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?

These are new...

Last reply: Tristan Roberts, Nov 14, 2018, 11:58 pm

Airport Terminal Project Boundary

NC-2009 PIf1: Minimum Program Requirements
posted by Kaarina Nehring on Jul 24, 2018, 2:54 pm

Hi all, 

We are working on a new terminal to an airport, and are wondering if the connector to another terminal should be included in the project boundary. The almost-LEED terminal has a...

Last reply: Summer Minchew, Jul 25, 2018, 2:19 pm

Report multiple electric meters on Energy Star Portfolio Manager

NC-2009 PIf1: Minimum Program Requirements
posted by Edward Gulick on Mar 31, 2018, 2:14 pm

I am (finally) wrapping up documentation on a multi-tenant building.  It is a LEED-NC project because over 50% of the leaseable space is owner-occupied.  The building has 4 electric meters; 3 for...

Last reply: Trista Brown, Apr 2, 2018, 12:38 pm

Download Forms

NC-2009 PIf1: Minimum Program Requirements
posted by Ralph Bicknese on Aug 11, 2015, 5:02 pm

Hello,

I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with...

Last reply: Tristan Roberts, Jan 15, 2016, 10:23 pm

One single building

NC-2009 PIf1: Minimum Program Requirements
posted by MKK LEED on Oct 8, 2015, 1:15 pm

We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203...

Last reply: Gustavo De las Heras Izquierdo, Oct 22, 2015, 1:40 am

Using interpretation 10203 for a hotel site

NC-2009 PIf1: Minimum Program Requirements
posted by Susan Di Giulio on Oct 21, 2015, 3:10 pm

We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to...

Last reply: Gustavo De las Heras Izquierdo, Oct 22, 2015, 1:26 am