Difficulty uploading the formNC-2009 PIf1: Minimum Program Requirementsposted by Avery Gretton on Nov 17, 2020, 9:47 am
Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit". I've repeatedly downloaded, completed, and attempted... Last reply: Tristan Roberts, Dec 10, 2020, 12:01 pm |
|
Reasonable Project Site BoundaryNC-2009 PIf1: Minimum Program Requirementsposted by Katherine Norris on Jun 18, 2019, 4:03 pm
Hello! The project I am working on is a full renovation of a... Last reply: Emily Purcell, Jun 19, 2019, 1:38 pm |
|
MPR #6- Option 3NC-2009 PIf1: Minimum Program Requirementsposted by Edgar Arevalo on Apr 22, 2019, 9:52 am
So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences. However, since I've been charged with filling out the instructions tab, I'm... |
|
PI Form 1, Must Use a Reasonable Site BoundaryNC-2009 PIf1: Minimum Program Requirementsposted by Vincent Pieri on Apr 10, 2019, 2:55 pm
Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundary... |
|
LEED 2009 Submission deadlineNC-2009 PIf1: Minimum Program Requirementsposted by Amy Harmon on Nov 13, 2018, 4:05 pm
Is there a deadline for projects that have been registered as 2009? Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates? These are new... Last reply: Tristan Roberts, Nov 14, 2018, 11:58 pm |
|
Airport Terminal Project BoundaryNC-2009 PIf1: Minimum Program Requirementsposted by Kaarina Nehring on Jul 24, 2018, 2:54 pm
Hi all, We are working on a new terminal to an airport, and are wondering if the connector to another terminal should be included in the project boundary. The almost-LEED terminal has a... Last reply: Summer Minchew, Jul 25, 2018, 2:19 pm |
|
Report multiple electric meters on Energy Star Portfolio ManagerNC-2009 PIf1: Minimum Program Requirementsposted by Edward Gulick on Mar 31, 2018, 2:14 pm
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric meters; 3 for... Last reply: Trista Brown, Apr 2, 2018, 12:38 pm |
|
Download FormsNC-2009 PIf1: Minimum Program Requirementsposted by Ralph Bicknese on Aug 11, 2015, 5:02 pm
Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with... Last reply: Tristan Roberts, Jan 15, 2016, 10:23 pm |
|
One single buildingNC-2009 PIf1: Minimum Program Requirementsposted by MKK LEED on Oct 8, 2015, 1:15 pm
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203... Last reply: Gustavo De las Heras Izquierdo, Oct 22, 2015, 1:40 am |
|
Using interpretation 10203 for a hotel siteNC-2009 PIf1: Minimum Program Requirementsposted by Susan Di Giulio on Oct 21, 2015, 3:10 pm
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to... Last reply: Gustavo De las Heras Izquierdo, Oct 22, 2015, 1:26 am |