Forum quick links
Carpool spaces for motorcycles?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erin Holdenried on
I have a project that includes a large number of motorcycle parking. Can motorcycle parking be excluded from this credit if pursuing Option 2?
Load Calcs for Don't Account for Natural Ventilation Operable
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Eric Shamp on
Our project is a major renovation to an existing college faculty office building with very low floor-to-floor heights. The lack of plenum space made air distribution ducts infeasible...
Energy Star shutdown
EBOM-2009 EAc1:Optimize Energy Performanceposted by Trista Brown on
Hi all Heads up that Energy Star's Portfolio Manager website will be completely unavailable from midnight June 26 through July 10!!
Silver or higher membership required for member discounts
posted by Hernando Miranda on
My interpretation is correct.
Master site credits applicabilty
posted by Marcio Alberto Casado Pereira on
We have a campus with 9 buildings elegible to seek LEED but only some of them will seek the certification (we are still deciding which ones).
Multiple Zone or 100% OA (fancoil to outside air)
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi! I have a project where a fan coil is providing outside air (outside air treated) to other fancoils. How do I enter this fan coil (outside air) on the worksheet 62MZCalc? Must indicate in mul
Simulation on the 21 of september
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Xavier Bigot on
Hi! I was wondering why does LEED require to run a simulation on the 21st of september? It also requires to perform the simulation during a clear sky condition.
Pollutant Management Plan
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michelle Xuereb on
As part of this credit, LEED Canada 2009 requires the owner to implement a management plan to minimize pollution and eutrophication of waterways from excess nutrient pollutants such as nitrogen and
Derated Insulation
NC-2009 EAp2:Minimum Energy Performanceposted by Todd Bundren on
I had a response from an energy model reviewer indicating my r-value calculations are not acceptable because we failed to derate the 3.5" R-11 batt insulation per Table A9.28B of ASHREA 90.1-2007.
Recycled Content % Not Specified as Pre- or Post-Consumer
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by American University on
Several of the toner cartridges that our buildings routinely buy claim to have recycled content, but their product documentation does not specify whether it is post-consumer or post-industrial mate