LEED v4 EBOM - Commissioning

EBOM-v4 EAc2:Existing building commissioning - implementation
posted by  Aber Alvi  on 

A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the

1
Fri May 25, 2018, 12:26 am

Species not able to receive reclaimed water

NC-2009 WEc1:Water Efficient Landscaping
posted by  Brightworks Sustainability  on 

We are building on a previously developed site where there are many existing Redwood trees that will not be uprooted for the project.

5
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Wed Mar 21, 2018, 10:51 pm

EAp2-c1 ACP

CS-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings,

While performing EAp2 for a C&S registered project, could we apply the ACP spreadsheet calculator as we did in CS 2009.

Thanks.

3
Wed Mar 21, 2018, 8:10 pm

Regularly Occupied Area - Kitchen Countertops and Islands

NC-2009 PIf3:Occupant and Usage Data
posted by  Rose Winter  on 

I know that residential kitchens are considered regularly occupied.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Mar 21, 2018, 8:04 pm

Facade lighting - off after 10pm

NC-2009 SSc8:Light Pollution Reduction
posted by  Anna Korinkova  on 

Hello, Would that be possible to reach the credit, if the facade lighting doesn't fullfil the upligth criteria, but it is turned off after 10pm?

4
Wed Mar 21, 2018, 7:04 pm

Elevators with regenerative braking - EAp2 form

CS-2009 EAp2:Minimum Energy Performance
posted by  Pamela Svetllana Santos Souza  on 

Hello, We are modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices. My question is about the Minimum Energy Perfomance credit form (EAp2).

2
Wed Mar 21, 2018, 6:44 pm

guestrooms keycard: power adjustment for automatic lighting ctrl

NC-2009 EAc1:Optimize Energy Performance
posted by   Habitech Distretto Tecnologico Trentino  on 

This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off.

11
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Wed Mar 21, 2018, 6:39 pm

Seeking expert opinion relating to a legal case

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ellen Fox  on 

I don't know if this is the appropriate forum for this question but I don't know where else to ask my question and I also thought it might be of interest to this group.

1
Wed Mar 21, 2018, 6:47 pm

Performance Period

EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoring
posted by  Summer Minchew  on 

The LEEDonline form for this credit indicates that installation of outdoor airflow measurement device, summary report/maintenance plan and trend graph from at least one outdoor airflow measurement

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Mar 21, 2018, 5:35 pm