Forum quick links
Addenda item from 1/5/2018 - Required Documentation table
NC-v4 EAc5:Renewable energy productionposted by Erica Downs on
Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense. It is regarding the Required Documentation table, page 439 in the RG
Option 1 & 2
NC-v4 EQc6:Interior lightingposted by Christine Chow on
Are existing light fixtures required to be included in the calculations for both options?
WS 2018--Design & Health
posted by Nadav Malin on
WELL & Fitwel and beyond.
Guiding Questions:
New renewable energy that is not double counted - enough?
NC-2009 EAc6:Green powerposted by Maria Porter on
Another question for another project: The project has purchased shares in a new solar park, Sweden’s biggest when it’s finished.
Option 1 - "at least three lighting levels"
NC-v4 EQc6:Interior lightingposted by Megan Leslie on
Hi,
The correct/latest 62MZ & LEED min. IAQ spreadsheet?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aru Sau on
Is "v2009v4_Minimum IAQ Performance Calculator_v03" spreadsheet is the correct/right one for a project registered in February 2016 in LEED 2009? Also, Is there any updated "62MZCalc.xls" (Revised A
ASHRAE 90.1-2007 vs 90.1-2010
NC-2009 EAp2:Minimum Energy Performanceposted by Tapio Peltonen on
Has anyone compared ASHRAE 90.1-2007 vs 90.1-2010 to see, if you get the same points in EAc1 or do you get less points?
minimum parking spaces required by code vs. the 40% reduction from based ratio
NC-v4 LTc7:Reduced parking footprintposted by Penny ROJ on
I don't understand when we calculated the minimum parking spaces required by code , for example 50, and the 40% reduction from based ratio is 45, how can we provide the parking spaces less tha
90 % of windows should be shaded
Homes-v4 EAc6:Building orientation for passive solarposted by Filemon Kapuno on
Will I get the credit if I use Pella Windows with Built-in Window Blinds? It shades the opening on the summer solstice and can be open on winter solstice.