Forum quick links
Does Boston's MBTA Silver Line count as Bus Rapid Transit?
NC-v4 LTc5:Access to quality transitposted by Eric Dammeyer on
Our team is working on a project in Boston located near the MBTA Silver Line (0.46 miles from the Silver Line Way stop).
LEEDv4 MRc1 Option 4 Whole-Building Life-Cycle Assessment
Schools-NC-v4 MRc1:Building life-cycle impact reductionposted by Theresa Lehman on
Has anyone used any life-cycle assessment software? If so, what was the software? How long did it take to produce an assessment? What the software free?
Seasonal Commissioning
NC-v4 EAc1:Enhanced commissioningposted by komal m on
Is seasonal commissioning required or optional for proejcts? Is seasonal commisioning applicable for tropical areas, as there is hardly any seasonal variation observed throughout the year?
FSC Invoices, Chain of Custody, and Certified Wood Cost
CI-2009 MRc7:Certified Woodposted by Eric Thompson on
I'm working on a project in Norway and I'm somewhat confused about the documentation for Certified Wood. The Reference Guide states: Collect all *vendor* invoices for permanently installed wood p
Area used in calculation?
NC-v4 LTc7:Reduced parking footprintposted by Dave Hubka on
When registering a project in LEED Online the gross floor area is used. Gross floor area is calculated from the exterior walls. https://usgbc.org/glossary#gross-floor-area-gfa
Hazardous ingredients
NC-v4.1 MRc4:Material Ingredientsposted by Aleksandra Suchomska on
If a manufacturer provides an inventory of all potentially hazardous ingredients (up to 100ppm) but omits ingredients that pose no risk and does not list them, does the report qualify for Option 1
LEED ND GIBp1 - WELL Building Certification
ND-v4 GIBp1:Certified green buildingposted by Jennifer Bryant on
Would certification of buildings within the masterplan under the IWBI's WELL Building Standard V2 be sufficient to fulfil the requirements of this credit?