Campus bike rakes

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Stacey Olson  on 

My understanding is that with a campus project, the bike racks simply need to be located within the campus (or 200' from the campus). Is that correct?

2
Mon Jul 14, 2014, 5:17 pm

Performance Period - Retrofits and Changes to # of Credits?

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  Wendy Lao  on 

My building is aiming to be LEED EBOM Silver and received a preliminary audit from PG&E in 2011 which resulted in a score of 80 in Energy Star Portfolio (or 9 LEED points).

3
LEED Sustainability Intern
County of Santa Clara
LEEDuser Basic Member
10 thumbs up
Mon Jul 14, 2014, 12:41 pm

NC & CI MRc5 DIVISION 12 – FURNISHINGS

NC-2009 MRc5:Regional materials
posted by  Ian McCall  on 

Hello, I am working a LEED NC 2009 & Retail CI historic building MRc5.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Jul 11, 2014, 9:52 pm

Artworks and Antiques

NC-2009 MRc3:Materials reuse
posted by  Omar Elrawy  on 

In a new construction, which is an Office building, does it count reusing signed artworks and antiques that were existing in the old building?

3
Default Avatar
Energy Engineer/LEED Consultant
Community Environmental Center
LEEDuser Basic Member
3 thumbs up
Fri Jul 11, 2014, 3:31 pm

Minimum threshold for projects with new areas and existing areas

CS-2009 EAp2:Minimum energy performance
posted by  MARCIO OROFINO  on 

We have a project which qualifies for CS and can be treated as a single building.

5
ENE Consultores
ENE CONSULTORES
LEEDuser Basic Member
11 thumbs up
Fri Jul 11, 2014, 3:21 pm

What about furniture?

NC-2009 MRc3:Materials reuse
posted by  Nelina Loiselle  on 

If instead of purchasing new furniture for the new buidling if we re-use the furniture from the old building will that qualify? Assuming we are counting furniture across MR credits.

6
Thu Jul 10, 2014, 9:41 pm

LEED Forms not Calculating correctly.

Schools-2009 EAp2:Minimum energy performance
posted by  BEN MONROE  on 

I'm not sure if this belongs here or in EC1. This is for a LEED-S 2009 renovation project with an addition. We have updated our energy model input based on the initial design review comments.

3
Default Avatar
Associate
Mallen Gowing Berzins Architecture
LEEDuser Basic Member
0 thumbs up
Thu Jul 10, 2014, 8:02 pm

Low emitting materials for Schools 2009

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  J W  on 

We have documented 4.1, 4.2, 4.3 and 4.6 by alternative compliance using NC 2009 rules. At the bottom of the form it only shows that I have documented 1 point. Any ideas?

5
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Jul 10, 2014, 3:53 pm

LEED BD+C Question

NC-2009 SSc5.2:Site development - maximize open space
posted by  Farah A.  on 

A commercial office building with a footprint of 70,000 square feet has an overall site area of 200,000 square feet.

5
Default Avatar
LEEDuser Basic Member
7 thumbs up
Thu Jul 10, 2014, 3:36 pm

Precertification Final Decision

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Tracy Baker  on 

We received our Precertification Final Decision for our Core and Shell building. LEED online indicates I can accept or appeal the final decision.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Thu Jul 10, 2014, 1:18 pm