Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

updated moderation rules for this page

General forums
posted by  Tristan Roberts  on 

Some good discussion on this page -- thanks all.

0

Eligibility of PV systems receiving SRECs

NC-2009 EAc2:On-Site Renewable Energy
posted by  Adam Prince  on 

I apologize if this was covered explicitly in another discussion. In Massachusetts, there's a well-established SREC market.

1
Fri Jan 3, 2014, 8:59 pm

Senior Living Community - Multiple Registrations really needed?

LEED Guidance for Campuses and Multiple Buildings
posted by  Werner Maassen  on 

Our project entails an existing Senior Housing and Care Campus in California consisting of 10 buildings. Our client/owner/operator wants to achieve LEED Silver for 6 of the buildings which will be

1
Fri Feb 28, 2014, 1:15 pm

Existing systems modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Tiffany Moore  on 

If a project retains existing mechanical systems, but the overall scope of the renovations meets the new construction threshold, are the baseline calcs based on code-minimum or should the project a

1
Tue Jan 7, 2014, 7:33 pm

Sidewalk clarification

Pilot-Credits PC14:Walkable Streets
posted by  Michelle Oishi  on 

One of the requirements states, "At-grade crossings with driveways account for no more than 10% of the length of sidewalks within the project".

1
Mon Feb 29, 2016, 1:30 am

M&V case 2

CI-2009 EAc3:Measurement and Verification
posted by  Chris Miller  on 

CI project, 75% or more of the space is occupied by the tenant, and I have seen the 4/1/12 addenda with the replacement language for Case 2.

1
Tue Jan 7, 2014, 8:19 pm

Calculating FTE

Calculating FTEs
posted by  Nicole Kimoto  on 

I have 3 shifts in a 24-hour period. In the first shift, I have a total of 410 occupants during first 2 hours of that shift.

0

Natural ventilation in a Multifamily building

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Walter Parks  on 

We have an apartment building in which we have both mechanical ventilation and natural ventilation.

1
Tue Jan 7, 2014, 2:04 am

Calculate Button on Form

CS-2009 WEp1:Water Use Reduction
posted by  John Riker  on 

Our MEP has filled in all the information required for WEp1 form, but pressing calculate (on MS Internet Explorer) does not generate any results.

1
Sat Jul 26, 2014, 5:29 am

Commercial Office - Rating System selection

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Rohit Jagnani  on 

I have a client looking for LEED certification of its Commercial offices.

1
Tue Jan 7, 2014, 3:46 pm