Ventilation strategy in a warehouse areaEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Eric Dyer on Nov 4, 2024, 1:20 am
Hi all, We'll take natutal ventilation in warehouse area however doesn't meet maximum distance. And mechanical ventilation is too low min. OA, because under 10 peoples are there.... |
|
Reasonable assumption for plenum ceilingEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Omar Elrawy on Oct 14, 2024, 4:53 am
We have old existing office building where ducted FCU is serving all the spaces. Fresh air is dumped to the plenum (no ducts), likewise for return air, so mixing happen randomly within the... Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:12 am |
|
Minimum Indoor Air Quality CalculatorEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Gustav Alfaro on Oct 4, 2019, 1:40 am
Hi to all, I cant find the Minimum Indoor Air Quality Calculator for v4.1 O+M. I noticed there are some differences in the credit intent as compared with the v4 version, for... Last reply: Pulak Goyal, Jul 2, 2024, 11:44 pm |
|
Fresh Air RequirementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on Nov 28, 2023, 4:10 am
I have an existing self storage warehouse to be certified under LEED v4.1 O+M Existing Buildings. It has no regular occupants and no regularly occupied spaces. Usually the storage spaces... Last reply: Catarina Costa Goncalves, Jul 1, 2024, 7:40 am |
|
Calculator of Minimum Indoor Air Quality performanceEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by DORRA Kouka on Jun 11, 2024, 6:32 am
Hello everyone, I just want to ask if you are fecing the same issue in the calculator of Minimum Indoor Air Quality performance. After inserting all the required data in the added system, the... Last reply: DORRA Kouka, Jun 11, 2024, 1:05 pm |
|
Minimum Air RequirementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on May 2, 2024, 2:58 am
I have an interior space going for LEED O+M v4.1 Interiors. The building is very old and the drawings of 1 out of 4 floors is not available. The rest of the 3 are available with the ACMV layout... Last reply: Dave Hubka, May 2, 2024, 7:29 am |
|
Minimum OA OptionsEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Courtney Mayes on Feb 23, 2024, 3:59 pm
Hello, I have a site that has a shared OAD for two units. The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage. Even with reduced CFM per occupant... Last reply: Dave Hubka, Feb 24, 2024, 8:14 pm |
|
Change of space during performance periodEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on Dec 8, 2023, 3:12 am
I have a building going for LEED O+M v4.1 Existing Buildings Certification. Currently it has offices on one of the floors, but it is going to be changed into inactive storage space in the... |
|
Systems Unable to Meet Required Outdoor Airflow RatesEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Dang Thi on May 20, 2020, 12:23 am
I have a question, compare to LEED v4... Last reply: Gustavo De las Heras Izquierdo, Sep 28, 2023, 10:51 am |
|
Measurement regard outside air measurementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Michael Ling on Jun 14, 2023, 5:11 am
Hello LEEDusers, I have a project which consist a typical office building in Hong Kong, each floor contain 2 PAU which contain 200L/s flow rate, the building is not very large each floor consist... |