Forum quick links
Demand Response Program available but building can't meet requirements
NC-v4 EAc4:Demand responseposted by Jason Garvens on
Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi
Management of on site runoff at a neighboring retention pond
NC-v4 SSc4:Rainwater managementposted by Jason Garvens on
I'm working on a project being built in a designated industrial park area.
Steven Burke Introduction
posted by Steven Burke on
Greetings all, and welcome to all those who already introduced themselves! My name is Steven Burke and I am a Sustainability Manager at Consigli Construction in Massachusetts. We are Ea
Externally illuminated building signage
NC-v4 SSc6:Light pollution reductionposted by Gordon Wong on
I have a project in Auburn, CA for the California Conservation Corp. The new building will have a stem mounted luminaire that will illuminate the building name. Since this luminiar
Roof Top Patio
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Hello, 1/4 of my project's roof area is going to be patio that is accessible to occupants. Can rooftop patio be excluded?
Track Energy Consumption data
EBOM-v4 EAp3:Building-level energy meteringposted by Ana Paula Quiros on
According to the guide:
Track energy use monthly, beginning at least 12 months before the final day of the building’s initial LEED
O+M performance period.
What is a CB and why can't I submit my project?
posted by Brightworks Sustainability on
I went to submit my project today and received an error message stating "Your project has not been assigned a CB.
ETS Blower Door Test- Suite Preparation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mohammad Fakoor on
Hello Everyone,
Retrofit of a existing building into green building
EBOM-2009 WEc1:Water Performance Measurementposted by Mohammed Ibrahim on
Storm water from neighboring site
NC-v4 SSc4:Rainwater managementposted by Bradley Magnusson on
The project I am working on is in a campus setting and the neighboring site's excess runoff is discharged into a storm drain pipe that runs through our project's