Classroom Sinks

posted by  Donald Bonnett  on 
9
CPD, LEED A.P.
Weigand Associates
LEEDuser Basic Member
19 thumbs up
Tue Nov 5, 2013, 2:25 am

% of recycled content in steel Rebar

NC-2009 MRc4:Recycled Content
posted by  Mahbuba Khan AIA, LEED AP BD+C  on 

What is the % of recycled content steel rebar needs to have to qualify to get the MR credit on recycled content?

6
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Mon Nov 4, 2013, 11:08 pm

Energy Modeling donations

Schools-2009 EAc1:Optimize Energy Performance
posted by  Stantec BG+LU FW  on 

Does anyone know of groups who offer donations for energy modeling?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 4, 2013, 10:49 pm

Records of contractor submittals

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lewis Hewton  on 

Following on from my previous query - Is it common practice to upload (or a portion of) contractor statements to accompany the product cutsheets. i.e.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 4, 2013, 10:24 pm

Corrective Action for Thermal Comfort Survey

Schools-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Stantec BG+LU FW  on 

The owner is signing off on the fact that a plan for corrective action WILL BE developed, but it does not clarify who develops it, nor does the plan of corrective action need to be uploaded.

2
Instrumentation and Control Engineer / LEED AP BD+C
Dar Al Handasah
LEEDuser Basic Member
4 thumbs up
Mon Nov 4, 2013, 10:13 pm

Grout

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael E. Edmonds-Bauer  on 

Does anybody know what is the VOC content for grout? By grout I mean the "paste" that goes betwenn two ceramic tiles, like the one in a restroom.

3
Mon Nov 4, 2013, 8:43 pm

Core and Shell within New Construction

LEED Rating System Selection
posted by  Lawrence Lile  on 

We are working on a building which is 14% core-and-shell. The rest is being finished by the developer and leased out. We are registering under BD&C New Construction.

5
Mon Nov 4, 2013, 8:17 pm

Exhaust rate in garage

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maria Porter  on 

I want to raise the question again about underground garages and IEQc5. The credit clearly says that the exhaust rate should be 0.5 CFM/sf, I understand that.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Nov 4, 2013, 7:43 pm

Deadline for final Review (addressing review comments)

General forums
posted by  Susann Geithner  on 

You have 25 business days starting with the day you got the review back. You might also be able to get an extension, which you will have to inquire for at the GBCI.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Nov 4, 2013, 7:26 pm

Time for EAc3 submittal

CS-2009 EAc3:Enhanced Commissioning
posted by  Ron Dean  on 

Hello, Is it possible to submit the EAc3 form with the other ones for the Design Review Phase and Construction Review Phase?

2
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Mon Nov 4, 2013, 7:23 pm