Agile applied to Project Delivery
posted by Barbra BatShalom on
Hey Sages, Just lobbing this over the transome - not sure if anyone else cares :) but this would be a great group to dig in if anyone IS interested.
Difficult Development Areas and Poverty Rate Qualified
CS-v4 LTc3:High priority siteposted by Hetvi Vora on
Does a site that falls under the DDA areas need to be poverty rate qualified in order for me to achieve the priority designation credit under High Priority Site?
Deep Soil mixing activity
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Summer Gorder on
Does deep soil mixing activity fall under 31.60 Foundations?
Industrial or non-regular process load
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
For a facilities with increased process load (more than 60%), other than data centers, including but not limited to industrial facilities, is there a particular guidance in establishing a baseline
Predictive Climate Data
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
Hello,
Wondering if anyone is using predictive (i.e., Future) climate data rather than past climate data when performing energy models.
Thanks!
Exterior concrete curing compound
NC-v4 EQc2:Low emitting materialsposted by akshaya bhaskar on
we are working on a project under LEEED V4 BD&C, does the exterior concrete curing compound (to be used on the exterior slabs) need to meet the VOC threshold to be credit-compliant?
City Potable Water Analysis Reports
NC-v4 WEc3:Cooling tower water useposted by Saif Abdulameer on
Can I use the potable water analysis reports from the city utility to calculate the cycles?
Are you using Environmental Materials Reporting Forms for the contractors?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Courtney Royal on
In previous versions of LEED, we used Environmental Materials Reporting Forms for contractors to report information for the MR and IEQ credits.